Skip to main content
## Page 1 # Solar Gate Cycles Per Day Reference Guide > Figure: Product images labeled HCTDCUL, LA500PKGUL, LA412PKGUL, LA400PKGUL, CSW24UL, CSL24UL, RSW12UL, RSL12UL, HDSL24UL, HDSW24UL, INSL24UL, and IHSL24UL. LiftMaster Solar Gate Operators feature a best-in-class power management system that delivers power when needed most to operate the gate while minimizing power consumption at all other times. Power is provided to the gate operator via batteries. The batteries are charged from a solar panel(s) connected to the operator. The number of solar panels required is determined by whether the application is for a single or dual-gate, daily cycle rate, control board current consumption by feature and accessory, and region of the country. Solar panel(s) must be located in an open area clear of obstructions and shading for the entire day. Snow, heavy fog or heavy rain affect solar panel performance and charge rate. Solar panels should be cleaned regularly to ensure proper operation. LiftMaster Gate Operators utilizing the solar option in cold weather climates where temperatures reach below -32°F (0°C) for more than 2 consecutive weeks require 33Ah batteries in lieu of standard 7Ah batteries. This is due to the effect of cold weather on batteries and a reduced number of hours of sunlight during the winter months. (see back page for details) > Figure: LiftMaster logo with “POWERED BY myQ.” ## Page 2 # LA500PKGUL / LA400PKGUL > Figure: Images of LA500PKGUL and LA400PKGUL gate operators. Current consumption by control board feature 24V (LA500PKGUL, LA400PKGUL) configurations. Add up current draw by feature and accessory to determine total current draw. | Control Board Feature | Current Draw (mA) | |---|---:| | Main board with no radios learned | 2.7 | | One or more LiftMaster® remote controls learned | +1 | | MyQ® device or wireless dual-gate learned | +2.4 | | Expansion board | +11.1 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +3.8 | | Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) | +5.8 | Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA) ### LA500PKGUL — Single Gate Solar Cycles Per Day / Dual-Gate Solar Cycles Per Day | Panel | mA | Z1 7Ah | Z1 33Ah | Z2 7Ah | Z2 33Ah | Z3 7Ah | Z3 33Ah | Dual Z1 7Ah | Dual Z1 33Ah | Dual Z2 7Ah | Dual Z2 33Ah | Dual Z3 7Ah | Dual Z3 33Ah | |---|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:| | 10W* | 5 | 52 | 56 | 30 | 33 | 11 | 12 | 22 | 24 | 13 | 14 | 5 | 5 | | | 15 | 43 | 47 | 23 | 25 | 5 | 6 | 19 | 20 | 10 | 11 | 2 | 3 | | | 20 | 39 | 43 | 19 | 21 | 3 | 3 | 17 | 19 | 8 | 9 | 1 | 1 | | | 40 | 24 | 27 | 6 | 8 | #NUM! | #NUM! | 10 | 12 | 3 | 3 | #NUM! | #NUM! | | | 60 | 10 | 13 | #NUM! | #NUM! | #NUM! | #NUM! | 4 | 6 | #NUM! | #NUM! | #NUM! | #NUM! | | 20W | 5 | 113 | 132 | 67 | 79 | 27 | 32 | 48 | 57 | 29 | 34 | 12 | 14 | | | 15 | 103 | 122 | 59 | 70 | 20 | 24 | 44 | 52 | 25 | 30 | 8 | 10 | | | 20 | 98 | 117 | 54 | 65 | 16 | 21 | 42 | 50 | 23 | 28 | 7 | 9 | | | 50 | 71 | 88 | 30 | 40 | #NUM! | 2 | 30 | 38 | 13 | 17 | #NUM! | 1 | | | 100 | 29 | 45 | #NUM! | 5 | #NUM! | #NUM! | 13 | 19 | #NUM! | 2 | #NUM! | #NUM! | | 40W | 5 | 212 | 299 | 128 | 181 | 53 | 75 | 91 | 129 | 55 | 78 | 23 | 32 | | | 15 | 201 | 288 | 118 | 170 | 44 | 66 | 86 | 124 | 51 | 73 | 19 | 29 | | | 20 | 196 | 282 | 113 | 165 | 40 | 62 | 84 | 121 | 49 | 71 | 17 | 27 | | | 100 | 114 | 194 | 41 | 86 | #NUM! | 3 | 49 | 83 | 18 | 37 | #NUM! | 1 | | | 200 | 27 | 93 | #NUM! | 7 | #NUM! | #NUM! | 11 | 40 | #NUM! | 3 | #NUM! | #NUM! | | 60W | 5 | 263 | 300 | 159 | 286 | 66 | 120 | 113 | 203 | 68 | 123 | 28 | 52 | | | 15 | 252 | 300 | 149 | 275 | 57 | 111 | 108 | 197 | 64 | 118 | 25 | 48 | | | 20 | 246 | 300 | 143 | 269 | 53 | 106 | 106 | 195 | 62 | 115 | 23 | 45 | | | 100 | 160 | 300 | 67 | 181 | #NUM! | 35 | 69 | 153 | 29 | 78 | #NUM! | 15 | | | 250 | 24 | 187 | #NUM! | 39 | #NUM! | #NUM! | 10 | 80 | #NUM! | 17 | #NUM! | #NUM! | \* 10W Solar Panel: Must use 24V Solar Panel. 20W Solar Panel: (2) 10W 12V panels in series. 40W Solar Panel: (2) 20W 12V panels or (4) 10W 12V panels in series. 60W Solar Panel: (6) 10W 12V panels or (2) 20W 12V & (2) 10W 12V in series. ### LA400PKGUL — Single Gate Solar Cycles Per Day / Dual-Gate Solar Cycles Per Day | Panel | mA | Z1 7Ah | Z1 33Ah | Z2 7Ah | Z2 33Ah | Z3 7Ah | Z3 33Ah | Dual Z1 7Ah | Dual Z1 33Ah | Dual Z2 7Ah | Dual Z2 33Ah | Dual Z3 7Ah | Dual Z3 33Ah | |---|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:| | 10W* | 5 | 81 | 87 | 47 | 51 | 18 | 19 | 35 | 37 | 20 | 22 | 8 | 8 | | | 15 | 68 | 74 | 36 | 39 | 8 | 10 | 29 | 32 | 15 | 17 | 4 | 4 | | | 20 | 61 | 68 | 30 | 34 | 4 | 5 | 26 | 29 | 13 | 14 | 2 | 2 | | | 40 | 37 | 43 | 10 | 13 | #NUM! | #NUM! | 16 | 18 | 4 | 5 | #NUM! | #NUM! | | | 60 | 16 | 21 | #NUM! | #NUM! | #NUM! | #NUM! | 7 | 9 | #NUM! | #NUM! | #NUM! | #NUM! | | 20W | 5 | 100 | 100 | 100 | 100 | 42 | 50 | 76 | 89 | 45 | 53 | 18 | 21 | | | 15 | 100 | 100 | 92 | 100 | 31 | 38 | 69 | 82 | 39 | 47 | 13 | 16 | | | 20 | 100 | 100 | 85 | 100 | 25 | 33 | 66 | 79 | 36 | 44 | 11 | 14 | | | 50 | 100 | 100 | 47 | 63 | #NUM! | 3 | 48 | 59 | 20 | 27 | #NUM! | 1 | | | 100 | 46 | 70 | #NUM! | 8 | #NUM! | #NUM! | 20 | 30 | #NUM! | 3 | #NUM! | #NUM! | | 40W | 5 | 100 | 100 | 100 | 100 | 83 | 100 | 100 | 100 | 86 | 100 | 35 | 51 | | | 15 | 100 | 100 | 100 | 100 | 70 | 100 | 100 | 100 | 79 | 100 | 30 | 45 | | | 20 | 100 | 100 | 100 | 100 | 63 | 97 | 100 | 100 | 76 | 100 | 27 | 42 | | | 100 | 100 | 100 | 65 | 100 | #NUM! | 5 | 77 | 100 | 28 | 58 | #NUM! | 2 | | | 200 | 42 | 100 | #NUM! | 11 | #NUM! | #NUM! | 18 | 63 | #NUM! | 5 | #NUM! | #NUM! | | 60W | 5 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 44 | 81 | | | 15 | 100 | 100 | 100 | 100 | 90 | 100 | 100 | 100 | 100 | 100 | 38 | 74 | | | 20 | 100 | 100 | 100 | 100 | 83 | 100 | 100 | 100 | 96 | 100 | 36 | 71 | | | 100 | 100 | 100 | 100 | 100 | #NUM! | 55 | 100 | 100 | 45 | 100 | #NUM! | 24 | | | 250 | 37 | 100 | #NUM! | 61 | #NUM! | #NUM! | 16 | 100 | #NUM! | 26 | #NUM! | #NUM! | \* Not currently offered in accessory line \** Numbers above for solar daily cycles are representative of wired dual-gate installation. If your installation is a wireless dual-gate setup use single gate cycle estimate and add in power draw for wireless dual-gate feature. \*** When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time. ## Page 3 # LA412PKGUL > Figure: LA412PKGUL linear gate operator shown with a solar panel. Current consumption by control board feature 12V (LA412PKGUL) configurations. Add up current draw by feature and accessory to determine total current draw. | Control Board Feature | Current Draw (mA) | |---|---:| | Main board with no radios learned | 4.2 | | One or more LiftMaster® remote controls learned | +1.5 | | MyQ® device or wireless dual-gate learned | +3.9 | | Expansion board | +18.5 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +6.6 | | Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) | +11 | Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA) ### LA412PKGUL — Single Gate Solar Cycles Per Day / Dual-Gate Solar Cycles Per Day | Panel | mA | Z1 7Ah | Z1 33Ah | Z2 7Ah | Z2 33Ah | Z3 7Ah | Z3 33Ah | Dual Z1 7Ah | Dual Z1 33Ah | Dual Z2 7Ah | Dual Z2 33Ah | Dual Z3 7Ah | Dual Z3 33Ah | |---|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:| | 10W | 6 | 100 | 100 | 82 | 86 | 32 | 34 | 59 | 62 | 35 | 37 | 14 | 15 | | | 25 | 100 | 100 | 63 | 67 | 17 | 19 | 50 | 53 | 27 | 29 | 7 | 8 | | | 30 | 100 | 100 | 58 | 63 | 14 | 15 | 48 | 51 | 25 | 27 | 6 | 7 | | | 50 | 91 | 98 | 40 | 44 | 1 | 2 | 39 | 42 | 17 | 19 | 1 | 1 | | | 100 | 43 | 49 | 3 | 5 | #NUM! | #NUM! | 19 | 21 | 1 | 2 | #NUM! | #NUM! | | 20W | 6 | 100 | 100 | 100 | 100 | 73 | 82 | 100 | 100 | 76 | 85 | 31 | 35 | | | 25 | 100 | 100 | 100 | 100 | 55 | 64 | 100 | 100 | 67 | 76 | 24 | 27 | | | 30 | 100 | 100 | 100 | 100 | 51 | 59 | 100 | 100 | 65 | 73 | 22 | 25 | | | 100 | 100 | 100 | 77 | 95 | #NUM! | 3 | 78 | 92 | 33 | 41 | #NUM! | 1 | | | 200 | 75 | 100 | #NUM! | 7 | #NUM! | #NUM! | 32 | 44 | #NUM! | 3 | #NUM! | #NUM! | | 30W | 6 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 100 | 47 | 57 | | | 25 | 100 | 100 | 100 | 100 | 90 | 100 | 100 | 100 | 100 | 100 | 39 | 48 | | | 30 | 100 | 100 | 100 | 100 | 85 | 100 | 100 | 100 | 100 | 100 | 37 | 46 | | | 100 | 100 | 100 | 100 | 100 | 22 | 39 | 100 | 100 | 66 | 86 | 9 | 17 | | | 200 | 100 | 100 | 51 | 91 | #NUM! | #NUM! | 83 | 100 | 22 | 39 | #NUM! | #NUM! | 20W Solar Panel: (2) 10W 12V panels in parallel or (1) 20W 12V panel. 30W Solar Panel: (3) 10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel. \* When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time. > Figure: Map of North America showing solar zones. Legend: ZONE 1 (6 HRS/DAY), yellow; ZONE 2 (4 HRS/DAY), gold; ZONE 3 (2 HRS/DAY), orange; NOT RECOMMENDED, blue. The map and daily cycle rate shown are approximations based upon the average solar radiation and the temperature effects on batteries in the given regions. Local geography and weather conditions may require additional solar panels. Solar optimized or wireless accessories are recommended in order to minimize power draw, as added accessories draw power and affect the daily cycle rate. For full details please reference the manual. ## Page 4 # RSW12UL / RSL12UL > Figure: Product images of RSW12UL and RSL12UL gate operators. Current consumption by control board feature 12V (RSW12UL, RSL12UL) configurations. Add up current draw by feature and accessory to determine total current draw. | Control Board Feature | Current Draw (mA) | |---|---:| | Main board with no radios learned | 4.2 | | One or more LiftMaster® remote controls learned | +1.5 | | MyQ® device or wireless dual-gate learned | +3.9 | | Expansion board | +18.5 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +6.6 | | Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) | +11 | Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA) ### RSL12UL — Gate Solar Cycles Per Day | Panel | mA | Z1 7Ah | Z1 Two 7Ah | Z1 33Ah | Z2 7Ah | Z2 Two 7Ah | Z2 33Ah | Z3 7Ah | Z3 Two 7Ah | Z3 33Ah | |---|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:| | 10W | 6 | 33 | 36 | 38 | 19 | 22 | 23 | 8 | 9 | 9 | | | 25 | 27 | 31 | 33 | 15 | 17 | 18 | 4 | 5 | 5 | | | 30 | 26 | 29 | 31 | 13 | 15 | 17 | 3 | 4 | 4 | | | 50 | 21 | 24 | 26 | 9 | 11 | 12 | #NUM! | 0 | 1 | | | 100 | 9 | 11 | 13 | #NUM! | 1 | 1 | #NUM! | #NUM! | #NUM! | | 20W | 6 | 50 | 50 | 50 | 37 | 47 | 50 | 15 | 19 | 22 | | | 25 | 50 | 50 | 50 | 32 | 41 | 47 | 11 | 15 | 17 | | | 30 | 50 | 50 | 50 | 30 | 40 | 45 | 9 | 13 | 16 | | | 100 | 33 | 48 | 50 | 12 | 20 | 25 | #NUM! | #NUM! | 1 | | | 200 | 8 | 20 | 27 | #NUM! | #NUM! | 2 | #NUM! | #NUM! | #NUM! | | 30W | 6 | 50 | 50 | 50 | 46 | 50 | 50 | 19 | 29 | 35 | | | 25 | 50 | 50 | 50 | 40 | 50 | 50 | 14 | 24 | 30 | | | 30 | 50 | 50 | 50 | 39 | 50 | 50 | 13 | 23 | 28 | | | 100 | 47 | 50 | 50 | 20 | 41 | 50 | #NUM! | 6 | 10 | | | 200 | 19 | 50 | 50 | #NUM! | 14 | 24 | #NUM! | #NUM! | #NUM! | 20W Solar Panel: (2) 10W 12V panels or (1) 20W panel in parallel. 30W Solar Panel: (3) 10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel. ### RSW12UL — Gate Solar Cycles Per Day | Panel | mA | Z1 7Ah | Z1 Two 7Ah | Z1 33Ah | Z2 7Ah | Z2 Two 7Ah | Z2 33Ah | Z3 7Ah | Z3 Two 7Ah | Z3 33Ah | |---|---:|---:|---:|---:|---:|---:|---:|---:|---:|---:| | 10W | 6 | 41 | 46 | 48 | 24 | 27 | 29 | 10 | 11 | 11 | | | 25 | 34 | 39 | 41 | 18 | 21 | 22 | 5 | 6 | 6 | | | 30 | 33 | 37 | 39 | 17 | 19 | 21 | 4 | 5 | 5 | | | 50 | 26 | 30 | 32 | 11 | 13 | 15 | #NUM! | 0 | 1 | | | 100 | 11 | 14 | 16 | #NUM! | 1 | 2 | #NUM! | #NUM! | #NUM! | | 20W | 6 | 50 | 50 | 50 | 47 | 50 | 50 | 19 | 24 | 27 | | | 25 | 50 | 50 | 50 | 40 | 50 | 50 | 13 | 18 | 21 | | | 30 | 50 | 50 | 50 | 38 | 50 | 50 | 12 | 17 | 20 | | | 100 | 42 | 50 | 50 | 15 | 26 | 32 | #NUM! | #NUM! | 1 | | | 200 | 10 | 25 | 34 | #NUM! | #NUM! | 2 | #NUM! | #NUM! | #NUM! | | 30W | 6 | 50 | 50 | 50 | 50 | 50 | 50 | 24 | 37 | 44 | | | 25 | 50 | 50 | 50 | 50 | 50 | 50 | 18 | 30 | 37 | | | 30 | 50 | 50 | 50 | 49 | 50 | 50 | 16 | 28 | 35 | | | 100 | 50 | 50 | 50 | 25 | 50 | 50 | #NUM! | 7 | 13 | | | 200 | 24 | 50 | 50 | #NUM! | 17 | 30 | #NUM! | #NUM! | #NUM! | 20W Solar Panel: (2) 10W 12V panels or (1) 20W panel in parallel. 30W Solar Panel: (3) 10W 12V panels in parallel or (1) 10W & (1) 20W 12V panel in parallel. \* When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time. ## Page 5 # CSW24UL / CSL24UL Current consumption by control board feature 24V (CSW24UL, CSL24UL) configurations. Add up current draw by feature and accessory to determine total current draw. > Figure: Two black LiftMaster gate operator units, each with a red control panel and LiftMaster logo. | Control Board Feature | Current Draw (mA) | |---|---:| | Main board with no radios learned | 2.7 | | One or more LiftMaster® remote controls learned | +1 | | MyQ® device or wireless dual-gate learned | +2.4 | | Expansion board | +11.1 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +3.8 | | Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) | +5.8 | Note: If the additional features on the expansion board are not used, it may be unplugged to conserve additional power draw (11mA) | CSW24UL | GATE SOLAR CYCLES PER DAY | | | | | | |---|---:|---:|---:|---:|---:|---:| | | Total System Current Draw (mA) | Zone 1 (6 Hrs Sunlight/Day) 7Ah batteries | Zone 1 (6 Hrs Sunlight/Day) 33Ah batteries | Zone 2 (4 Hrs Sunlight/Day) 7Ah batteries | Zone 2 (4 Hrs Sunlight/Day) 33Ah batteries | Zone 3 (2 Hrs Sunlight/Day) 7Ah batteries / 33Ah batteries | | 10W* Solar Panel<br>Note: Must use 24V Solar Panel | 5 | 19 | 20 | 11 | 12 | | | | 15 | 16 | 17 | | | | | | 20 | 14 | 16 | | | | | | 40 | | 10 | | | | | | 60 | | | | | | | 20W Solar Panel<br>Note: 20W would be (2) 10W 12V panels or (1) 20W 12V panel in series | 5 | 41 | 48 | 25 | 29 | 12 | | | 15 | 38 | 45 | 21 | 26 | | | | 20 | 36 | 43 | 20 | 24 | | | | 50 | 26 | 32 | 11 | 15 | | | | 100 | 11 | 16 | | | | | 40W Solar Panel<br>Note: 40W would be (4) 10W 12V or (2) 20W 12V panels in series | 5 | 78 | 110 | 47 | 66 | 19 / 28 | | | 15 | 74 | 106 | 43 | 63 | 16 / 24 | | | 20 | 72 | 104 | 41 | 61 | 15 / 23 | | | 100 | 42 | 71 | 15 | 32 | | | | 200 | | 34 | | 2 | | | 60W Solar Panel<br>Note: (6) 10W 12V or (2) 20W & (2) 10W 12V panels in series | 5 | 97 | 173 | 58 | 105 | 24 / 44 | | | 15 | 92 | 169 | 54 | 101 | 21 / 41 | | | 20 | 90 | 166 | 53 | 99 | 19 / 39 | | | 100 | 59 | 131 | 25 | 67 | / 13 | | | 250 | | 68 | | 14 | | | CSL24UL | GATE SOLAR CYCLES PER DAY | | | | | | |---|---:|---:|---:|---:|---:|---:| | | Total System Current Draw (mA) | Zone 1 (6 Hrs Sunlight/Day) 7Ah batteries | Zone 1 (6 Hrs Sunlight/Day) 33Ah batteries | Zone 2 (4 Hrs Sunlight/Day) 7Ah batteries | Zone 2 (4 Hrs Sunlight/Day) 33Ah batteries | Zone 3 (2 Hrs Sunlight/Day) 7Ah batteries / 33Ah batteries | | 10W* Solar Panel<br>Note: Must use 24V Solar Panel | 5 | 26 | 28 | 15 | 17 | | | | 15 | 22 | 24 | 12 | 13 | | | | 20 | 20 | 22 | 10 | 11 | | | | 40 | 12 | 14 | | | | | | 60 | 5 | 7 | | | | | 20W Solar Panel<br>Note: 20W would be (2) 10W 12V panels or (1) 20W 12V panel in series | 5 | 57 | 67 | 34 | 40 | 14 / 16 | | | 15 | 52 | 62 | 30 | 36 | 10 / 12 | | | 20 | 50 | 60 | 28 | 33 | 8 / 11 | | | 50 | 36 | 45 | 15 | 20 | / 1 | | | 100 | 15 | 23 | | 3 | | | 40W Solar Panel<br>Note: 40W would be (4) 10W 12V or (2) 20W 12V panels in series | 5 | 108 | 152 | 65 | 92 | 27 / 38 | | | 15 | 103 | 147 | 60 | 87 | 23 / 34 | | | 20 | 100 | 144 | 58 | 84 | 21 / 32 | | | 100 | 58 | 99 | 21 | 44 | / 1 | | | 200 | 14 | 47 | | 3 | | | 60W Solar Panel<br>Note: (6) 10W 12V or (2) 20W & (2) 10W 12V panels in series | 5 | 134 | 240 | 81 | 146 | 34 / 61 | | | 15 | 128 | 234 | 76 | 140 | 29 / 56 | | | 20 | 125 | 231 | 73 | 137 | 27 / 54 | | | 100 | 82 | 181 | 34 | 92 | / 18 | | | 250 | 12 | 95 | | 20 | | \* When installing LMRRUL/LMTBUL heater option refer to install manual for cycles and standby time. ## Page 6 # HDSL24UL/HDSW24UL Current consumption by control board feature 24V (HDSL24UL, HDSW24UL) configurations. Add up current draw by feature and accessory to determine total current draw. > Figure: Two black LiftMaster gate operator units with LiftMaster logos and red control panels. | Control Board Feature | Current Draw (mA) | |---|---:| | Main board with no radios learned | 4.2 | | One or more LiftMaster® remote controls learned | +1.5 | | myQ® device or wireless dual-gate learned | +3.9 | | Expansion board | +8.7 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +3.8 | | Monitored Wireless Edge Kit (Model LMWEKITU receiver accepts up to (4) edge transmitters and each transmitter accepts up to (2) wired edges for a total system of (8) Monitored LiftMaster Edges, (1) receiver per gate operator.) | +5.8 | | Auxiliary relay board | +11 | Note: If the additional features on the expansion board and/or auxiliary relay board are not used, they may be unplugged to conserve additional power draw. | HDSL24UL | Battery current draw (mA) | Zone 1 (6 Hrs Sunlight/Day) 7Ah | 33Ah | Zone 2 (4 Hrs Sunlight/Day) 7Ah | 33Ah | Zone 3 (2 Hrs Sunlight/Day) 7Ah | 33Ah | |---|---:|---:|---:|---:|---:|---:|---:| | 20W Solar Panel | 5 | 12 | 14 | | | | | | | 15 | 11 | 13 | | | | | | | 20 | 11 | 13 | | | | | | | 50 | | | | | | | | | 100 | | | | | | | | 40W Solar Panel | 5 | 23 | 32 | 14 | 20 | | | | | 15 | 22 | 31 | 13 | 18 | | | | | 20 | 21 | 31 | 12 | 18 | | | | | 100 | 12 | 21 | | | | | | | 200 | | 10 | | | | | | 60W Solar Panel | 5 | 28 | 51 | 17 | 31 | | 13 | | | 15 | 27 | 50 | 16 | 30 | | 12 | | | 20 | 27 | 49 | 16 | 29 | | 11 | | | 100 | 17 | 39 | | 20 | | | | | 250 | | 20 | | | | | | HDSW24UL | Battery current draw (mA) | Zone 1 (6 Hrs Sunlight/Day) 7Ah | 33Ah | Zone 2 (4 Hrs Sunlight/Day) 7Ah | 33Ah | Zone 3 (2 Hrs Sunlight/Day) 7Ah | 33Ah | |---|---:|---:|---:|---:|---:|---:|---:| | 20W Solar Panel | 5 | 14 | 16 | | | | | | | 15 | 12 | 15 | | | | | | | 20 | 12 | 14 | | | | | | | 50 | | 11 | | | | | | | 100 | | | | | | | | 40W Solar Panel | 5 | 25 | 36 | 15 | 22 | | | | | 15 | 24 | 35 | 14 | 20 | | | | | 20 | 24 | 34 | 14 | 20 | | | | | 100 | 14 | 23 | | 10 | | | | | 200 | | 11 | | | | | | 60W Solar Panel | 5 | 32 | 57 | 19 | 34 | | 14 | | | 15 | 30 | 55 | 18 | 33 | | 13 | | | 20 | 30 | 54 | 17 | 32 | | 13 | | | 100 | 19 | 43 | | 22 | | | | | 250 | | 22 | | | | | ## Page 7 # INSL24UL/IHS24UL Current consumption by control board feature 24V (IHSL24UL, INSL24UL) configurations. Add up current draw by feature and accessory to determine total current draw. > Figure: Two black LiftMaster gate operator units with LiftMaster logos and red lower panels. All performance metrics are estimates and are subject to change at any time. Actual results will vary due to variables specific to the site. **Note:** For additional details and specifications on solar usage, please refer to LiftMaster.com | Typical System Standby Battery Current Consumption (mA) | | |---|---:| | System Voltage | 24V | | Control board with no radios programmed | 2.7mA | | One or more LiftMaster® remote controls programmed | +1 mA | | myQ® device or wireless dual gate programmed | +2.4 mA | | Expansion board | +11.1 mA | | Relay adapter board | +11.1 mA | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +3.8 mA | | Add up current draw by feature and accessory to determine total current draw | | **NOTE:** The use of photoelectric sensor heaters (models LMRRUL and LMTBUL) is **NOT** recommended in solar applications. | INSL24UL Solar Gate Cycles Per Day - 1,000 lb. gate 20 ft. travel | Battery Current Draw (mA) | Zone 1 7Ah | 33Ah | Zone 2 7Ah | 33Ah | Zone 3 7Ah | 33Ah | |---|---:|---:|---:|---:|---:|---:|---:| | 20W Solar Panel | 5 | 20 | 23 | 12 | 14 | | | | | 15 | 18 | 22 | 10 | 12 | | | | | 20 | 18 | 21 | | 12 | | | | | 50 | 13 | 16 | | | | | | | 100 | | | | | | | | 40W Solar Panel | 5 | 38 | 53 | 23 | 32 | | 13 | | | 15 | 36 | 51 | 21 | 30 | | 12 | | | 20 | 35 | 50 | 20 | 29 | | 11 | | | 100 | 20 | 34 | | 15 | | | | | 200 | | 17 | | | | | | 60W Solar Panel | 5 | 47 | 84 | 28 | 51 | 12 | 21 | | | 15 | 45 | 82 | 26 | 49 | 10 | 20 | | | 20 | 44 | 81 | 26 | 48 | | 19 | | | 100 | 29 | 63 | 12 | 32 | | | | | 250 | | 33 | | | | | | IHSL24UL Solar Gate Cycles Per Day - 3,000 lb. gate 20 ft. travel | Battery Current Draw (mA) | Zone 1 7Ah | 33Ah | Zone 2 7Ah | 33Ah | Zone 3 7Ah | 33Ah | |---|---:|---:|---:|---:|---:|---:|---:| | 20W Solar Panel | 5 | | 11 | | | | | | | 15 | | 10 | | | | | | | 20 | | | | | | | | | 50 | | | | | | | | | 100 | | | | | | | | 40W Solar Panel | 5 | 18 | 25 | 11 | 15 | | | | | 15 | 17 | 24 | | 14 | | | | | 20 | 16 | 23 | | 14 | | | | | 100 | | 16 | | | | | | | 200 | | | | | | | | 60W Solar Panel | 5 | 22 | 39 | 28 | 24 | | | | | 15 | 21 | 38 | 26 | 23 | | | | | 20 | 20 | 38 | 26 | 22 | | | | | 100 | 13 | 30 | 12 | 15 | | | | | 250 | | 15 | | | | | ## Page 8 # HCTDCUL Add up current draw by feature and accessory to determine total battery current draw. > Figure: Red LiftMaster control enclosure with black mounting bracket and LiftMaster logo. | CONTROL BOARD FEATURE | CURRENT DRAW (mA) | |---|---:| | Main board with no radios learned | 2.7 | | One or more LiftMaster® remote controls learned | +1 | | MyQ® device or wireless dual-gate learned | +2.4 | | Expansion board | +11.1 | | Per loop detector LOOPDETLM (up to 3 loop detectors can be plugged in to the expansion board) | +3.8 | | HCTDCUL | BATTERY CURRENT DRAW (mA) | ZONE 1 (6 HRS SUNLIGHT/DAY) 7 AH BATTERIES | ZONE 2 (4 HRS SUNLIGHT/DAY) 7 AH BATTERIES | ZONE 3 (2 HRS SUNLIGHT/DAY) 7 AH BATTERIES | |---|---:|---:|---:|---:| | 10W* Solar Panel<br>NOte: Must Use 24V Solar Panel | 5 | 13 | | | | | 15 | 11 | | | | | 20 | | | | | | 40 | | | | | | 60 | | | | | 20W Solar Panel<br>Note: 20W would be (2) 10W 12V panels in series or (1) 20W 12V Panel | 5 | 29 | 17 | | | | 15 | 26 | 15 | | | | 20 | 25 | 14 | | | | 50 | 18 | | | | | 100 | | | | | 40W Solar Panel<br>Note: (4) 10W 12V or (2) 20W panels in series | 5 | 56 | 34 | 14 | | | 15 | 54 | 31 | 12 | | | 20 | 52 | 30 | 11 | | | 100 | 32 | 12 | | | | 200 | | | | | 60W Solar Panel<br>Note: (6) 10W 12V or (2) 20W 12V & (2) 10W 12V Panels in series | 5 | 74 | 45 | 19 | | | 15 | 72 | 42 | 17 | | | 20 | 70 | 41 | 15 | | | 100 | 48 | 22 | | | | 200 | 13 | | | ## Page 9 LiftMaster Solar Gate Operators are engineered to have low idle current draw including radio receiver to maximize battery life and solar performance. It is important to note, the following environmental factors can adversely affect battery performance in solar applications. - Cold temperature (below 32°F (0°C)) - Snow cover on solar panel - Reduced hours of sunlight in winter months In geographic areas that experience cold temperatures below 32°F (0°C) for more than two weeks in addition to any of the factors listed above, the following steps can be taken to ensure best performance: - Replace the standard 7Ah batteries with 33Ah batteries. (For linear actuators, use the optional XL control box model XLSOLARCONTUL) - In states adjacent to Canada and Canadian provinces, increase the angle of the solar panels by an additional 15 degrees (60 degrees total). This will optimize the solar panels for the winter months and reduce the buildup of snow and ice on the panels. Important note: Daily cycle rate and standby time will be reduced by at least 50% when temperatures reach extreme cold temperatures below -4°F (or -20°C) for periods of more than two weeks. For best performance during the winter months, snow and ice should be removed from the solar panel, moving parts on the gate and gate operator. In addition all snow should be removed from the path of the gate to prevent nuisance reversals. **Optional Power Supply for Cold Weather Applications** | Gate Operator | Optional Power Supply | |---|---| | LA500PKGUL, LA412PKGUL, LA400PKGUL | XLSOLARCONTUL (2) 33Ah batteries not included) | | CSW24UL, CSL24UL, HDSL24UL<br>HDSW24UL, IHSL24UL, INSL24UL | (2) 33Ah batteries recommended in lieu of standard 7Ah batteries | | RSW12UL, RSL12UL | (1) 33Ah batteries recommended in lieu of standard 7Ah batteries | If heavy amounts of snow are expected over several days, the manual disconnect may be engaged and the gate left open to allow access and snow removal. Once the snow is removed, simply reengage the manual disconnect to resume normal operation. ## Page 10 # Wiring ## Wire the solar panels - 12V Applications Models: LA412CONTU, LA412VDC, RSL12VDC, RSL12U, RSW12VDC, RSW12U > Figure: Five 12V solar-panel wiring diagrams, each showing a control-board terminal area labeled “BATT” and “DC POWER,” a wiring harness, black and red wires, inline connectors, and an upward arrow from the harness to the control board. Black-wire connections are marked with minus (−) symbols and red-wire connections with plus (+) symbols. Each diagram includes “(To Battery(ies)” beside the battery wiring. > > **10W APPLICATION (IN PARALLEL):** One solar panel labeled “10W,” wired with one black and one red wire through inline connectors to the harness. > > **20W APPLICATION (IN PARALLEL):** Two separate diagrams: one with two solar panels, each labeled “10W,” wired in parallel; and one with a single solar panel labeled “20W.” > > **30W APPLICATION (IN PARALLEL):** Two separate diagrams: one with three solar panels, each labeled “10W,” wired in parallel; and one with solar panels labeled “10W” and “20W,” wired in parallel. ## Wire the solar panels - 24V Applications Models: LA400CONTU, LA400VDC, LA500CONTU, LA500VDC, LA500, CSL24VDC, CSL24U, CSW24VDC, CSW24U, HDSL24UL, HDSW24UL, IHSL24UL, INSL24UL (for models CSL24V and CSW24V refer to the wiring instructions provided with the Solar Harness Kit [Model K94-36596]). Note: refer to installation manual for proper wiring to control board. > Figure: Five 24V solar-panel wiring diagrams, each showing a control-board terminal area labeled “BATT” and “DC POWER,” a wiring harness, black and red wires, inline connectors, and an upward arrow from the harness to the control board. Black-wire connections are marked with minus (−) symbols and red-wire connections with plus (+) symbols. Each diagram includes “(To Battery(ies)” beside the battery wiring. Orange wire connectors join panel wires. > > **20W APPLICATION (IN SERIES):** Two solar panels, each labeled “10W,” connected in series. > > **40W APPLICATION (IN SERIES):** Two separate diagrams: one with four solar panels, each labeled “10W,” connected in series; and one with two solar panels, each labeled “20W,” connected in series. > > **60W APPLICATION (IN SERIES):** Two separate diagrams: one with six solar panels, each labeled “10W,” connected in series; and one with two solar panels labeled “20W” and two solar panels labeled “10W,” connected in series. © 2022 The Chamberlain Group LLC. All Rights Reserved. myQ®, the myQ® logo, LiftMaster, the LiftMaster logo, are registered trademarks of the Chamberlain Group LLC. LiftMaster.com LMGTENCTSLGD 4/22