Skip to main content
## Page 1 # TROUBLESHOOTING GUIDE for 2022 UL 325 Compliant Gate Operators **NOTE:** This guide does not include BLDC Gate Operators, HDSL24UL, HDSW24UL, INSL24UL, and IHSL24UL. Models - LA500UL - LA400UL - LA412UL - CSW24UL - CSL24UL - RSL12UL - RSW12UL - CSW200UL - SL3000UL - SL585UL - SL595UL > Figure: Cover image showing multiple black LiftMaster gate operators: a slide operator cabinet, swing gate operators, a barrier arm operator, and linear actuator operators. LiftMaster logos are visible on the products. No dimensions, arrows, torque specifications, or wire specifications are shown. EXTERNAL SAFETY DEVICES REQUIRED. SEE SAFETY SECTION FOR UL325 ENTRAPMENT PROTECTION REQUIREMENTS IN YOUR OPERATOR MANUAL. THESE PRODUCTS MUST BE INSTALLED AND SERVICED IN ACCORDANCE WITH THE OPERATOR MANUAL BY A TRAINED GATE SYSTEMS TECHNICIAN ONLY. c UL us LISTED LiftMaster 300 Windsor Drive Oak Brook, IL 60523 LiftMaster® ## Page 2 # TABLE OF CONTENTS | Section | Page | |---|---:| | **SAFETY** | **1** | | SAFETY SYMBOL AND SIGNAL WORD REVIEW | 1 | | **BEFORE YOU BEGIN** | **2** | | UL COMPLIANT GATE OPERATORS | 2 | | **BASIC TROUBLESHOOTING** | **3** | | MULTI-METERS | 3 | | TRANSFORMERS | 4 | | RELAYS | 5 | | EXPANSION BOARD SWITCH SETTINGS | 5 | | CAPACITOR (FOR AC OPERATORS) | 6 | | DC MOTORS | 7 | | AC MOTORS | 8 | | ERASE MEMORY | 9 | | **DIAGNOSTIC CODES** | **11** | | **SOLAR** | **17** | | SOLAR TROUBLESHOOTING | 17 | | 24V APPLICATIONS | 18 | | 12V APPLICATIONS | 19 | | **POWER** | **20** | | MODELS CSW200UL AND SL3000UL | 20 | | MODELS SL585UL AND SL595UL (SINGLE PHASE) | 21 | | MODELS SL585UL AND SL595UL (THREE PHASE) | 22 | | MODEL LA412UL | 23 | | MODEL LA400UL | 24 | | MODEL LA500UL | 25 | | MODELS CSL24UL AND CSW24UL | 26 | | MODELS RSL12UL AND RSW12UL | 27 | | **MyQ®** | **28** | | FREQUENTLY ASKED QUESTIONS | 28 | | TROUBLESHOOTING MyQ® | 30 | | MyQ® ACCOUNT ISSUES | 31 | | MyQ® ERROR CODES | 33 | | INCOMPATIBLE ROUTER AND SWITCH | 35 | # SAFETY ## SAFETY SYMBOL AND SIGNAL WORD REVIEW When you see these Safety Symbols and Signal Words on the following pages, they will alert you to the possibility of **Serious Injury or Death** if you do not comply with the warnings that accompany them. The hazard may come from something mechanical or from electric shock. Read the warnings carefully. When you see this Signal Word on the following pages, it will alert you to the possibility of damage to your gate and/or the gate operator if you do not comply with the cautionary statements that accompany it. Read them carefully. **IMPORTANT NOTE:** - BEFORE attempting to install, operate or maintain the operator, you must read and fully understand the manual provided with your operator and follow all safety instructions. - DO NOT attempt repair or service of your gate operator unless you are a Trained Gate System Technician. > Figure: Three orange safety-signal panels. The first reads “WARNING” with a black triangle containing an exclamation mark, labeled “MECHANICAL.” The second reads “WARNING” with a black triangle containing an electrical-shock symbol, labeled “ELECTRICAL.” The third reads “CAUTION.” No arrows, dimensions, torque specifications, or wire specifications are shown. 1 ## Page 3 # BEFORE YOU BEGIN ## UL COMPLIANT GATE OPERATORS The UL standard requires gate operators to monitor for the presence of external entrapment devices and any fault conditions. LiftMaster has not only updated their line of gate operators to meet the new UL 325 standard, they have also taken the opportunity to add a common user interface and common feature sets across the line to increase performance, safety and accessibility. All LiftMaster UL compliant gate operators will come with external monitored retro-reflective photoelectric sensors. > Figure: Illustration of LiftMaster monitored retro-reflective photoelectric sensors, enclosed by an oval outline. Caption: “LiftMaster Monitored Retro-Reflective Photoelectric Sensors (Model LMRRU).” No arrows, dimensions, torque specifications, or wire specifications are shown. ## UL325 ENTRAPMENT PROTECTION REQUIREMENTS ### DEFINITIONS **ENTRAPMENT:** The condition when a person is caught or held in a position that increases the risk of injury. **SLIDE GATE ENTRAPMENT ZONE:** An entrapment zone exists if at any point during travel, the gap between the gate and any opposing fixed edge or surface such as posts, walls, pillars, columns, or the operator itself, is less than 16” (406 mm) in a location up to 6 ft. (1.8 m) above grade. **SWING GATE ENTRAPMENT ZONE:** Locations between a moving gate or moving, exposed operator components and a counter opposing edge or surface where entrapment is possible up to 1.8 m (6 ft.) above grade. Such locations occur if during any point in travel: a. The gap between the bottom of a moving gate and the ground is greater than 101.6 mm (4”) and less than 406 mm (16”); or b. The distance between the center line of the pivot and the end of the wall, pillar, or column to which it is mounted when in the open or closed position exceeds 101.6 mm (4”). Any other gap between a moving gate and fixed counter opposing edges or surfaces or other fixed objects is less than 406 mm (16”) (examples are walls, curbs, berms or other immovable objects). **INDEPENDENT MONITORED ENTRAPMENT PROTECTION DEVICE:** An entrapment protection device is independent if it is a different type (photoelectric sensors, edge device, inherent protection device) from the other devices in the same entrapment zone. Use the *Site Planning Safety Checklist* to identify entrapment zones found in your installation. ### REQUIREMENTS - A **minimum of two** independent monitored entrapment protection devices are required to be installed at each entrapment zone. - It is the responsibility of the installer to install external monitored entrapment protection devices for **each entrapment zone**. - A SLIDE gate operator will only operate with a **minimum of two** independent monitored entrapment protection devices installed in each direction; two in the open direction and two in the closed direction. - A SWING gate operator will only operate with a minimum of two independent monitored entrapment protection devices installed in either the open or closed direction. If no entrapment zone exists in the other direction, an external entrapment protection device is NOT required in that direction. Liftmaster Swing and Slide gate operators have an inherent entrapment protection device built-in. ***The installer MUST provide one additional entrapment protection device for each entrapment zone.*** Acceptable entrapment protection device types include: - Inherent (built into the operator) - LiftMaster monitored external photoelectric sensors, see Accessory page of the operator manual for acceptable sensors. - LiftMaster monitored external edge sensors, see Accessory page of the operator manual for acceptable sensors. 2 ## Page 4 # BASIC TROUBLESHOOTING ## MULTI-METERS The image is an example of a generic multimeter. LiftMaster currently has no intended affiliations with this multi-meter manufacturer. This is not an endorsement for this particular meter model. When shopping for a meter, look for a meter able to fit in a shirt pocket or clip on a belt. A meter with an audio signal (buzzer) for continuity checks is recommended. For testing motor current, a clamp-on ampmeter is preferred. > Figure: Illustration of a yellow and gray handheld digital multimeter with a display, rotary selector dial, buttons, input sockets, and red and black test leads. No readable manufacturer or model label is shown. No arrows, dimensions, torque specifications, or wire specifications are shown. ## CHECKING OHMS/CONTINUITY When checking the operation of a switch, select the ohm mode on multimeter. (The ohm symbol is Ω). Make sure the test leads are plugged into the correct sockets for reading ohms. If there is more than one setting in the ohm section of the meter, select the one with the audio signal. To test a limit switch, connect one test lead to the Common prong and the other to the Normally Closed prong. The meter should read 0 resistance or very low resistance. The electricity is flowing from the Common prong to the Normally Closed prong. This demonstrates continuity. Activate the switch, the meter will read Infinite resistance or no continuity. Infinite ohms is often expressed as “OL” on the meter, but do not confuse this with zero ohms. In continuity mode, a tone indicates zero ohms. The contacts inside the switch are no longer touching between the Common prong and the Normally Closed prong. Move the test lead from Normally Closed to Normally Open. While the activation arm is not pressed, the meter should read open circuit, demonstrating no continuity. Activating the arm should read 0 resistance, demonstrating continuity. The procedure is called a “Continuity Check” and is used to check for a continuous flow of electricity. ## CHECKING VOLTAGE A multimeter may have several settings for checking voltages. The number associated with each setting is the maximum voltage able to be read. A meter may be damaged if connected to a higher voltage than selected. Either AC or DC must be selected prior to testing any circuit. AC stands for alternating current and DC stands for direct current. AC is usually the incoming line voltage, i.e. 115 VAC, 460 VAC and so on. 24 VAC is also found in the control circuit of an operator. DC is usually a power source from a battery or the control voltage in a logic board. Set the meter to VOLTS AC at the lowest setting which is still higher than the expected voltage. If 115 VAC is expected and the meter has 10 VAC, 50 VAC, 250 VAC and 1000 VAC scales, turn the dial to 250 VAC. Some meters have only one VAC choice and the meter can automatically adjust for the voltage received (auto scaling). ## CHECKING MOTOR CURRENT A clamp-on meter is recommended for testing the motor current. These meters work by detecting the magnetic field surrounding a conductor so a high motor current does not pass through the meter. Ensure that when a generic multi-meter is testing current, the leads are placed in series with the current and not in parallel. Otherwise, the meter’s internal fuse will blow or will be damaged. In addition, the motor current may exceed the maximum current allowed by the meter’s specification, resulting in a blown meter fuse or damage to the internal circuitry. ## TESTING CAPACITANCE Ensure the meter has the means to test for the capacitance needed to check alternating current motor capacitors. Refer to the operator manual for the meter to learn about this feature. 3 ## Page 5 # BASIC TROUBLESHOOTING # TRANSFORMERS Transformers are used to change incoming voltage to a different outgoing voltage. A transformer has a primary side (incoming voltage) and a secondary side (outgoing voltage). The primary side connects to wires from the main power source and the secondary side outputs the transformed voltage. In commercial gate operators, the secondary side is generally 24 Vac. Read the markings on the transformer to determine the primary and secondary voltages. Transformers are rated in VOLT Amps (VA). A transformer can only pass the rated amount of electricity from the main power to the secondary side. Be careful not to overload the transformer. Verify the amperage rating on all devices connected to the 24 Vac side of the transformer including devices attached to the control board. Multiply the Amperage rating for each device by the voltage needed to run the device. > Figure: Drawing of a block transformer with mounting tab and six spade terminals. Labels: “24 Vac” at the two left terminals; “COM,” “120,” and “240” at the right terminals. Caption: “(Example: Block Transformer)”. ### EXAMPLE FOR CALCULATING AMPERAGE DRAW Below is an example of text for a label that could be placed on accessory devices: Output Rating…5 AMPS 28VAC or DC Max Power…24VAC @ 30ma The “Power” rating is required. The transformer’s secondary side is 24 VAC and the transformer is rated for 20VA. The example accessory above uses 30 milli-amps, which is .03 Amps. Multiply the volts being used (24V) and the amps (.03A) to get the VOLT Amps (VA) used by the accessory (24Vx0.03A=0.72VA). That leaves (20-0.72=) 19.28VA left for other accessories (photoelectric sensors, loop detectors, etc). Once the total VA exceeds 20VA, the operator may experience failures. For operator setups requiring multiple accessories, calculate total VA draw and upgrade the transformer if necessary (40VA transformers or greater are available). The output rating is how much electricity the accessory is able to have pass through it. This number is useful when determining if an accessory will properly function long term with the operator. The output rating has nothing to do with the required amount of electricity to make the accessory function. | TYPE OF TRANSFORMERS | MODELS | |---|---| | Plug-in Transformer | LA400UL, RSL12UL, RSW12UL | | Toroid Transformer | LA500UL, CSL24UL, CSW24UL, HD OPERATORS | | Block Transformer | CSW200UL, SL3000UL, SL585UL, SL595UL | ## Page 6 # BASIC TROUBLESHOOTING # RELAYS ## EXPANSION BOARD RELAYS In gate operators, relays are commonly used to control operator functions or activate/deactivate ancillary devices such as heaters or lights. When electricity is applied to a relay coil, it energizes a magnetic field that will close a Normally Open switch or open a Normally Closed switch. A relay typically has prongs labeled COM, NO, NC, and two prongs to power the relay coil. Relays are available with different coil voltages and contact options. The auxiliary relays are single pole, double throw. A pole is another name for a switch. Double pole is two separate switches being turned on or off by the same activation coil (two separate Comms, NCs and NOs). Double throw means there are two positions for the output (NO and NC). The 2 Auxiliary Relays on the expansion board can be set to activate in different conditions based on how you set the 3 switches for each relay. They can be set to activate any time the gate is open or closed or when the gate is in motion. In one setting you can trip the relay 3 seconds before the gate begins to move and while the gate is in motion. You can set the relay to activate if the gate is forced off the closed limit position. One setting for Aux Relay 1 uses the LEDs for the Open, Close, and Stop inputs to display how many cycles (to the nearest 100) the operator has performed. The Auxiliary relays can also be used in conjunction with a barrier arm operator for the Sequenced Access Management System (SAMS) or tandem function. See the operator’s manual for a list of all the available functions. ### RELAYS ON THE EXPANSION BOARD > Figure: Diagram of an expansion board. Three terminal blocks at left are labeled J3 “(FAIL SAFE) SHADOW,” J4 “(FAIL SAFE) INTERRUPT,” and J5 “(FAIL PER SWITCH) EXIT.” The central area shows AUX RELAY 1 and AUX RELAY 2, each with numbered switch positions and relay terminals labeled “NO COM NC.” A black oval highlights the auxiliary relay switch and terminal area. Other readable labels include “QUICK CLOSE,” “AC FAIL,” “EXIT FAIL,” “ANTI TAIL,” “POWER,” “TO MAIN BOARD,” “CLOSE,” “SBC,” “OPN,” “CLS,” “STP,” and “COM.” ### RELAY WIRING EXAMPLE > Figure: Wiring diagram showing two relay terminal blocks, each labeled “NO COM NC,” connected to a Traffic Light and a Class 2 Power Source. The power source label reads “Class 2 Power Source (42 Vdc [34 Vac], 5 A maximum).” Red and black wires are shown, with red “+” and black “−” polarity markings. The traffic light has red and green lamps. # EXPANSION BOARD SWITCH SETTINGS - The Quick Close feature allows the gate to close without having to travel to the full open position. When active, the operator monitors the Interrupt Loop and Close Eyes inputs and once the vehicle clears these devices the gate will reverse and Close. - When the AC Fail Open switch is selected, the operator will move the gate to the Open position if AC Power is lost. There is a 30-second delay before the gate opens after the loss of primary AC power. If the switch is set for the Battery option, the operator will run on the battery until the battery drops below a certain voltage. At that point, the gate will either open or close depending on how you set the Low Battery switch on the main control board. **NOTE:** The AC Fail Open switch is not functional for AC operators. - The Exit Fail switch sets the operator to either open or remain closed in the event of an internal detector failure (loop short or open). - The Anti-Tailgate switch alters the way the Interrupt Loop affects gate operation. When the switch is on, the gate pauses if the gate is closing and the interrupt loop is activated. The gate will stay paused until the vehicles backs off the loop, then continue closing. > Figure: Expansion board illustration with a black oval around lower switch settings and relay terminals. Labels in the circled area include “QUICK CLOSE,” “AC FAIL,” “EXIT FAIL,” “ANTI TAIL,” “ON,” “OFF,” “OPEN,” “BATT,” “CLOSE,” and “NO COM NC.” ## Page 7 # BASIC TROUBLESHOOTING > Figure: Warning banner with electrical hazard symbol and text “WARNING.” Below: “To protect against fire and electrocution:” and bullet “DISCONNECT power (AC or solar and battery) BEFORE installing or servicing operator.” # CAPACITOR (FOR AC OPERATORS) **SYMPTOM:** A bad capacitor will cause a motor to hum when trying to run, or stall while it is running. ## CHECK THE CAPACITOR: > Figure: Step 1 photograph of a circuit breaker panel with a hand switching a breaker. Red numbered circle: “1.” Caption: “Disconnect ALL power from operator.” > Figure: Step 2 photograph of a person using a screwdriver across capacitor terminals above a motor. Red numbered circle: “2.” Text: “IMPORTANT: Discharge the capacitor BEFORE touching it!” “Discharge the capacitor by touching a screwdriver across the capacitor terminals (make sure to hold the insulated end of the screwdriver when doing this). You may see a small spark when discharging the capacitor, this is normal.” “Visually inspect the capacitor for any burn marks, bubbling or oil leakage. This is a good indication of a bad capacitor.” > Figure: Step 3 photograph of a multimeter measuring a capacitor. Red numbered circle: “3.” Meter display reads “7.48.” Text: “Using a multi-meter, measure the capacitance between the capacitor contacts. The measurement on the meter should be within the uF rating on the label.” “The meter must be capable of making capacitance measurements. See the meter’s operator manual for more information.” **SOLUTION:** If the capacitor measures outside of 20% of rated capacitance, it should be replaced. ## Page 8 # BASIC TROUBLESHOOTING > Figure: Warning banner with electrical hazard symbol and text “WARNING.” Below: “To protect against fire and electrocution:” and bullet “DISCONNECT power (AC or solar and battery) BEFORE installing or servicing operator.” # BRUSHED DC MOTORS **SYMPTOM:** The motor will not run. ## CHECK THE MOTOR: Disconnect ALL power from operator. Disconnect the gate from the operator. ### 12V MOTOR > Figure: Two-step wiring diagram for testing a 12V motor. A control board is labeled “CONTROL BOARD.” Step 1, in a red circle: “Disconnect the motor harness from control board.” An arrow points downward from the motor connector. Step 2, in a red circle: “Connect the battery to the motor harness as shown.” The motor is labeled “MOTOR”; a single battery is labeled “BATTERY.” Red and black jumper cables are labeled “Jumper Cables.” Battery terminals are marked red “+” and black “−”. ### 24V MOTOR > Figure: Two-step wiring diagram for testing a 24V motor. A control board is labeled “CONTROL BOARD.” Step 1, in a red circle: “Disconnect the motor harness from control board.” An arrow points downward from the motor connector. Step 2, in a red circle: “Connect the batteries to the motor harness as shown.” The motor is labeled “MOTOR”; two batteries are labeled “BATTERIES.” Red and black jumper cables are labeled “Jumper Cables.” Battery terminals are marked red “+” and black “−”. The batteries are wired in series. **SOLUTION:** If the motor does not run, replace the motor, but if the motor runs, this process does not prove the motor is good. ## Page 9 # BASIC TROUBLESHOOTING > **WARNING** > To protect against fire and electrocution: > • DISCONNECT power (AC or solar and battery) BEFORE installing or servicing operator. # AC MOTORS **SYMPTOM:** The motor will not run. ## CHECK THE MOTOR: Disconnect ALL power from operator. Disconnect the gate from the operator. Unplug the motor harness from the board and measure the resistance of the motor. Refer to illustrations. ### MODELS SL585U & SL595U - SINGLE PHASE MOTORS Measure resistance between: RUN 1 = 600 ohms or less RUN 2 = 600 ohms or less START = 50k ohms or greater THERMAL SWITCH = 0 ohms > Figure: Illustration of a multimeter and a 12-pin motor harness connector. Text: “Unplug motor harness from power board BEFORE measuring.” Connector labeled “Motor Harness,” with pins 1–12. A vertical pin/wire chart shows: 12 Blue; 11 Yellow; 10 Yellow/Black; 9 Orange; 8 White; 7 Red; 6 Purple; 5 Gray; 4 Yellow/Black; 3 Purple; 2 Green; 1 Black. Arrows identify RUN 2 between pins 12 and 9, RUN 1 between pins 11 and 9, START between pins 5 and 4, and THERMAL SWITCH between pins 8 and 1. ### MODELS SL585U & SL595U - THREE PHASE MOTORS Measure resistance between: 15 to 7 14 to 8 12 to 6 11 to 7 9 to 5 Resistance should be 600 ohms or less. There should be continuity between 1 and 4 (Thermal Switch) > Figure: Illustration of a multimeter and a 15-pin motor harness connector. Text: “Unplug motor harness from power board BEFORE measuring.” Connector labeled “Motor Harness,” with pins 1–15. A vertical pin/wire chart shows: 15 Yellow; 14 Black; 13 Purple; 12 Red; 11 White; 10 Purple; 9 Blue; 8 Brown; 7 Orange; 6 Gray; 5 Purple; 4 Yellow/Black; 3 Purple; 2 Purple; 1 Yellow/Black. Arrows identify resistance test pairs 15–7, 14–8, 12–6, 11–7, and 9–5. Red arrows identify THERMAL SWITCH continuity between pins 1 and 4. ### MODELS CSW200U & SL3000 > Figure: Drawing of a power board connected to a motor. Board connections are labeled Red, Black, and White. Text beside motor: “MOTOR” and “Motor shaft should turn easily.” Text: “Measure resistance between: Red and Black; Black and White; Red and White. Resistance should be 600 ohms or less.” Board labeled “POWER BOARD.” **SOLUTION:** If the motor measured too much resistance, replace the motor. ## Page 10 # BASIC TROUBLESHOOTING # ERASE MEMORY ## ERASE ALL REMOTE CONTROLS 1. Press and release the LEARN button (operator will beep and green XMITTER LED will light). 2. Press and hold the LEARN button again until the green XMITTER LED flashes and then release the button (approximately 6 seconds). All remote control codes are now erased. ## TO REMOVE AND ERASE ALL MONITORED ENTRAPMENT PROTECTION DEVICES (AC OPERATORS) 1. Remove the entrapment protection device wires from the terminal block. 2. Press and release the OPEN LEFT and OPEN RIGHT buttons simultaneously. The handing direction LED will remain solid. The other direction LED will begin flashing (entering setup mode). 3. Press the OPEN LEFT and OPEN RIGHT buttons simultaneously to exit. ## TO REMOVE AND ERASE MONITORED ENTRAPMENT PROTECTION DEVICES (DC OPERATORS) 1. Remove the entrapment protection device wires from the terminal block. 2. Press and release the SET OPEN and SET CLOSE buttons simultaneously. The SET OPEN and SET CLOSE LEDs will turn on (entering learn limit mode). 3. Press and release both SET OPEN and SET CLOSE buttons again to turn off the SET OPEN and SET CLOSE LEDs (exiting learn limit mode). ## TO CLEAR WIRELESSLY PAIRED OPERATORS 1. Press and release the LEARN button (operator will beep and green XMITTER LED will light. 2. Press and release the LEARN button for a second time (operator will beep and yellow XMITTER LED will light. 3. Press and hold the LEARN button until the yellow XMITTER LED flashes, and then release. The operator is now unpaired. 4. Repeat this sequence on the opposing operator if possible. ## TO ERASE LIMITS (DC OPERATORS) 1. To erase the limits, press and hold the SET OPEN and SET CLOSE buttons simultaneously (5 seconds) until both the SET OPEN and SET CLOSE LEDs blink rapidly and the operator beeps. 2. Release the buttons and the SET OPEN and SET CLOSE LEDs will blink slowly indicating the limits will need to be set. **NOTE:** Any remaining entrapment protection devices will automatically be relearned and any disconnected entrapment protection devices will be unlearned. For a Swing gate operator, a minimum of ONE monitored external entrapment protection device is required in either the open or closed direction to operate the gate. A slide gate operator will only operate with a minimum of two external monitored entrapment protection devices installed, one in each direction. It is the responsibility of the installer to ensure all entrapment zones are protected with a minimum of one external entrapment protection device. ## TO ERASE HANDING (AC OPERATORS) 1. To erase the limits, press and hold the OPEN LEFT and OPEN RIGHT buttons simultaneously (5 seconds) until both the OPEN LEFT and OPEN RIGHT LEDs blink rapidly and the operator beeps. 2. Release the buttons and the OPEN LEFT and OPEN RIGHT will blink slowly indicating the handing will need to be set. **Test the operator after any adjustments are made according to the Obstruction Test in the operator manual.** **Test all entrapment protection devices after any adjustments per the instructions provided with the device.** ## Page 11 # BASIC TROUBLESHOOTING ## PROGRAMMING LIMITS WITH BUTTONS AND REMOTES For dual gate applications, the limits must be set for each operator. The gate MUST be attached to the operator before setting the limits and force. Ensure the gate is closed. 1. Press and release the SET OPEN and SET CLOSE buttons simultaneously to enter limit setting mode. 2. Press and hold the OPEN or CLOSE button on the remote control until the gate reaches the desired open position. The gate can be jogged back and forth using the OPEN and CLOSE buttons on the remote control. 3. Once the gate is in the desired open position, press and release the STOP button on the remote control. 4. Press and release the OPEN button in the remote control again to set the open limit. 5. Press and hold the CLOSE or OPEN button on the remote control until the gate reaches the desired close position. The gate can be jogged back and forth using the OPEN and CLOSE buttons on the remote control. 6. Once the gate is in the desired close position, press and release the STOP button on the remote control. 7. Press and release the CLOSE button on the remote control again to set the close limit. 8. Cycle the gate open and close. This automatically sets the force. When limits are set properly, the operator automatically exits limit setting mode. ## HOW MONITORED ENTRAPMENT DEVICES ARE LEARNED Monitored devices are learned once connected to the board. 1. Connect the Ethernet cable to the LiftMaster Internet Gateway and the router. 2. Connect power to the LiftMaster Internet Gateway. 3. Create an online account by visiting www.liftmaster.com. 4. Register the LiftMaster Internet Gateway. 5. Use an internet enabled computer or smartphone to add devices. The LiftMaster Internet Gateway will stay in learn mode for three minutes. 6. Press the Learn button twice on the primary operator (the operator will beep as it enters learn mode). The LiftMaster Internet Gateway will pair to the operator if it is within range, and the operator will beep if programming is successful. ## SET THE FORCE AND RUN DISTANCE 1. Press the OPEN test button to open the gate. 2. Press and release both the OPEN LEFT and OPEN RIGHT handing buttons. 3. Press the handing button below the solid LED. 4. Run the operator one full cycle using the test buttons. The initial forces and run distance will be set during this cycle. Create an online account by visiting www.myliftmaster.com. ## Page 12 # DIAGNOSTIC CODES > **WARNING** > To retrieve logic board diagnostic history, the operator must be activated. > • Replace ONLY with fuse of same type and rating. > > For continued protection against fire: # DIAGNOSTIC CODES ## TO VIEW THE CODES The codes will show on the diagnostic display. > Figure: Three illustrations of a vertical “TEST BUTTONS” control panel with green OPEN and CLOSE buttons and an orange STOP button. Arrows show the sequence: “Press and hold the STOP button...”; “…then press and hold the CLOSE button...”; “…then press and hold the OPEN button until ‘Er’ shows on the display.” Labels include OPEN, CLOSE, STOP, BATT LOW, and AC PWR OVLD. The operator will show the code sequence number followed by the code number: | CODE SEQUENCE NUMBER | CODE NUMBER | |---|---| | The first number shows the most recent code (example: “01”). The display will show the sequence of codes that occurred starting with “01” and going up to code “20”. | The second number shown after the code sequence number is the code itself (31-99, example “31”). Refer to the chart on the following page for an explanation of each code. | A SECOND LATER.... > Figure: Two diagnostic display examples labeled “DIAGNOSTICS,” showing two-digit seven-segment displays. > Figure: Large logic-board illustration. Labels include “DIAGNOSTICS DISPLAY,” “OPEN, CLOSE, & STOP BUTTONS,” “SET OPEN,” “SET CLOSE,” “BATT FAIL,” “BATT DELAY,” “LEARN,” “TEST BUTTONS,” “TIMER TO CLOSE,” “REVERSAL FORCE,” “MOVE GATE,” “DIAGNOSTICS,” “STATUS,” “INPUT POWER,” “TIMER,” “GATE MOVING,” “BATT LOW,” “AC PWR OVLD,” “FUSE 30A 32V,” “BATT,” “DC POWER,” “FUSE 30A 32V,” “MOTOR,” “AC & BATT FAIL BACKDRIVE,” “SECURE / MANUAL,” “DN RESET,” “ENCODER,” “ALARM,” “OPEN CLOSE STOP COMMON,” “FIRE DEPT. OPEN,” “EXIT,” “SHADOW,” “EYES/INTERRUPT,” “CLOSE EDGE,” “OPEN EYES/EDGE,” “DUAL GATE,” “LOCK,” “ACCESSORY POWER,” and “RPM.” ## TO SCROLL THROUGH THE SAVED CODES > Figure: Two “TEST BUTTONS” control-panel illustrations. An arrow to the OPEN button is labeled: “Press the OPEN button to cycle to the most recent code (‘01’).” An arrow to the CLOSE button is labeled: “Press the CLOSE button to cycle to the oldest code (up to ‘20’).” The operator will only keep track of up to 20 codes, then will start saving over the oldest codes as new codes occur. **NOTE:** Some diagnostic codes represent normal operation. See the Diagnostic Does for more details. ## TO EXIT Press and release the STOP button to exit. The display will also time out after two minutes of inactivity. ## TO RESET THE CODE HISTORY 1. Press and hold the STOP button for six seconds. The display will show “Er” then “CL” alternately for six seconds. 2. Release the STOP button. The code history has now been reset and the display will show “--” until a new code occurs. 3. Press and release the STOP button to exit. ## Page 13 # DIAGNOSTIC CODES Some codes are saved in the code history and some are not. If a code is not saved it will briefly appear on the display as it occurs, then disappear. When servicing of the operator is complete, erase the code history by pressing the STOP button until the display flashes “Er” then “CL” (about 6 seconds). When the codes have been erased the display will show “— —”. | Code | Meaning | Symptom | Solution | Saved | |---|---|---|---|---| | LIFTMASTER SYSTEM — 31 | The main control board has experienced an internal failure. | Gate operator will not run. | Disconnect all power, wait 15 seconds, then reconnect power (reboot). If issue continues, replace main control board. | NO | | LIFTMASTER SYSTEM — 32 | Linear Drive Disengaged (Operator 1) | Gate operator will not run and the gate moves back and forth easily. | Disengage, then re-engage operator. Check wiring and connections. | YES | | LIFTMASTER SYSTEM — 33 | Linear Drive Disengaged (Operator 2) | Gate operator will not run and the gate moves back and forth easily. | Disengage, then re-engage operator. Check wiring and connections. | YES | | LIFTMASTER SYSTEM — 34 | The operator is not receiving information from the Absolute Position Encoder (APE). | The operator will run for a second or two, then stop (there are no obstructions). The diagnostic display shows 34. | • Check the APE sensor for a blocked diode from dust or debris. Use compressed air to clean the area.<br>• Check the APE wire harness connections. A wire may be loose or disconnected from the harness.<br>• Replace the APE assembly and wire harness if necessary.<br><br>TEST: Attempt to run the operator. | YES | | LIFTMASTER SYSTEM — 35 | Max-Run-Time Exceeded Error | The gate stops short of the programmed limit. | Check for an obstruction, then reprogram the limits. | YES | | LIFTMASTER SYSTEM — 36 | Product ID Error | If product ID is not present or damaged while the gate is powered it will continue to run while showing code 36. If power is lost while product ID is damaged or broken it will not run and will also show code 36. If the board was used in a different type of operator it code 36 would show as well (example board out of swing to a slide). | Was the control board just replaced? If so, erase limits, then set limits again. If not, disconnect all power, wait 15 seconds, then reconnect power before changing product ID harness. | YES | | LIFTMASTER SYSTEM — 37 | Product ID Failure | If product ID is not present or damaged while gate is powered it will continue to run while showing code 37. If power is lost while product ID is damaged or broken it will not run and will also show code 37. The operator will also not be able to set limits. | Unplug product ID harness then plug back in. Disconnect all power, wait 15 seconds, then reconnect power before replacing product ID harness. | YES | | LIFTMASTER SYSTEM — 38 | Hard Stop Limit (Operator 1), the limit is set too close to a hard stop and the gate is stopping on the hard stop instead of the limit. | The gate will reverse intermittently. The operator may wind up a lot of tension on the chain and flex the chassis. For dual gate installations the gates may not move in sync. This could cause a problem later on if left (nuisance reversals). | Reprogram the limits so they are not close to a hard stop.<br><br>TEST: Run the operator and check for code 38 on the diagnostic display. | NO | | LIFTMASTER SYSTEM — 39 | Hard Stop Limit (Operator 2), the limit is set too close to a hard stop and the gate is stopping on the hard stop instead of the limit. | The gate will reverse intermittently. The operator may wind up a lot of tension on the chain and flex the chassis. For dual gate installations the gates may not move in sync. This could cause a problem later on if left (nuisance reversals). | Reprogram the limits so they are not close to a hard stop.<br><br>TEST: Run the operator and check for code 38 on the diagnostic display. | NO | | LIFTMASTER SYSTEM — 40 | Battery overvoltage | The operator runs faster than normal and the diagnostic display shows Code 40. | Too much voltage on the battery. Check harness. Make sure you are using the recommended batteries for the operator. Check the battery voltage and battery harness.<br><br>TEST: After checking the batteries, check for code 40 on the diagnostic display. | YES | ## Page 14 # DIAGNOSTIC CODES Some codes are saved in the code history and some are not. If a code is not saved it will briefly appear on the display as it occurs, then disappear. When servicing of the operator is complete, erase the code history by pressing the STOP button until the display flashes “Er” then “CL” (about 6 seconds). When the codes have been erased the display will show “— —”. | Code | Meaning | Symptom | Solution | Saved | |---|---|---|---|---| | LIFTMASTER SYSTEM — 41 | Battery overcurrent | Code 41 will show up on the diagnostic display. There will possibly be low battery voltage (the LOW BATT LED will be on). | Possible short of the battery charge harness. Check harness. Make sure the recommended battery(ies) are being used. Make sure you do NOT have a 12V battery on a 24V system. Check battery fuse.<br><br>TEST: After checking the batteries, check for code 41 on the diagnostic display. | YES | | LIFTMASTER SYSTEM — 42 | No battery at boot up | Operator will run and the diagnostic display will show Code 42 with power cycle or boot-up. The operator will not run on battery backup after power loss. | Check the battery connections at the main control board and at the battery terminals. Make sure the J15 plug is plugged into the board. Replace batteries if depleted to less than 20V on a 24V system or less than 10V on a 12V system. Make sure there is NOT a single 12V battery on a 24V system.<br><br>TEST: After checking the batteries, check for code 42 on the diagnostic display. | YES | | INSTALLED SYSTEM — 43 | Exit Loop Error | Gate will lock in the open position or closed position (depending on the dip switch setting). The exit loop will not be functional and diagnostic display will show Code 43. | LiftMaster Plug-in Loop Detector only. Failure or missing loop. Check loop wiring throughout connection. May be a short in the loop, or an open connection in the loop. | YES | | INSTALLED SYSTEM — 44 | Shadow Loop Error | **All Operators:** Gate will not close.<br><br>**Models LA400U, LA412U, LA500U, RSW12U:** Gate will not open. | LiftMaster Plug-in Loop Detector only. Failure or missing loop. Check loop wiring throughout connection. May be a short in the loop, or an open connection in the loop. | YES | | INSTALLED SYSTEM — 45 | Interrupt Loop Error | Gate will not close. | LiftMaster Plug-in Loop Detector only. Failure or missing loop. Check loop wiring throughout connection. May be a short in the loop, or an open connection in the loop. | YES | | INSTALLED SYSTEM — 46 | Wireless edge battery low | The operator will beep 2 times with a command. Critically low battery will cause gate to latch open or closed depending on the board settings (Batt Fail switch settings on DC operator control board and Exit Fail switch setting on the AC operator expansion board). | Replace batteries in wireless edge. | YES | | LIFTMASTER SYSTEM — 47 | Fault detected in the power board. | Operator will not run. | Replace the power board. | YES | | LIFTMASTER SYSTEM — 50 | Run-Distance Error | Gate will stop prior to reaching the desired limit setting. | **DC Operators:** Gate unbalance detected. Make sure the gate is installed on a level surface and not on an excessive grade.<br><br>**AC Operators:** The limits are less than the minimum requirement or longer than what was learned. Check limit positions and proper switch function. Run-distance can be re-learned by setting the handing again. | YES | | INFORMATIONAL — 51 | Pass-point not detected (Operator 1) | Operator runs at a constant slow speed. | Check yellow pass-point wiring. If limits are not accurate, reprogram. | NO | | INFORMATIONAL — 52 | Pass-point not detected (Operator 2) | Operator runs at a constant slow speed. | Check yellow pass-point wiring. If limits are not accurate, reprogram. | NO | | INFORMATIONAL — 53 | Brownout occurred | Operator will run and show code 53. | AC/DC board supply dipped below allowable level. Review power supply and wiring. If rebooting, ensure enough time for discharge of power to force a fresh boot. | YES | | INFORMATIONAL — 54 | Wireless Second Operator Communication Error | Only the commanded operator will respond. | Check the second operator for power. If OFF, restore power and try to run the system. If powered, deactivate the wireless feature and then reprogram the second operator. | YES | ## Page 15 # DIAGNOSTIC CODES Some codes are saved in the code history and some are not. If a code is not saved it will briefly appear on the display as it occurs, then disappear. When servicing of the operator is complete, erase the code history by pressing the STOP button until the display flashes “Er” then “CL” (about 6 seconds). When the codes have been erased the display will show “— —”. | Code | Meaning | Symptom | Solution | Saved | |---|---|---|---|---| | LIFTMASTER SYSTEM — 55 | System AC Overvoltage | Operator will not function and show code 55. | Check with the utility company. | YES | | LIFTMASTER SYSTEM — 56 | System AC Undervoltage | Operator will continue to run and show code 56. | Check wiring and wire gauge to operator. | YES | | LIFTMASTER SYSTEM — 57 | Limit Error - Stuck Switch | Operator will not run and show code 57. | Check switch for proper operation. Check harness for shorts. Replace if defective. | YES | | LIFTMASTER SYSTEM — 58 | Limit Error - Wrong Switch | Operator will not run and show code 58. | Check motor wiring. | YES | | LIFTMASTER SYSTEM — 59 | Missing Power Board | Operator will not run and show code 59. | Check harness for shorts. Check for presence of power board. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 60 | Minimum number of monitored entrapment protection devices (one) not installed. | The operator will not run and the EYES EDGE LEDs will flash on the main board and expansion board. | Make sure there is a monitored entrapment protection device installed and connected to the operator. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 61 | CLOSE EYE/INTERRUPT held more than 3 minutes on main board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on main control board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 62 | CLOSE EDGE held more than 3 minutes on main board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on main control board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 63 | OPEN EYE/EDGE held more than 3 minutes on main board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on main control board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 64 | CLOSE EYE/INTERRUPT held more than 3 minutes on expansion board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on expansion board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 65 | CLOSE EYE/EDGE held more than 3 minutes on expansion board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on expansion board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 66 | OPEN EYE/EDGE held more than 3 minutes on expansion board | The operator will only move with constant pressure and will beep while moving | Check for alignment or obstruction. Check wired input on expansion board. The photoelectric sensors may be installed too far apart. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 67 | Wireless edge triggered more than 3 minutes | Gate will not move. | Check wired input for wiring issue, obstruction or damaged edge. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 68 | Wireless edge loss of monitoring | Gate will not move. | Check wireless edge inputs. Confirm the transmitter and receiver are installed at the recommended locations and within the range specified. Confirm the transmitter battery is operational and installed securely. Check the receiver to main control board wiring harness for damage and make sure the connector is fully seated. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 69 | Wireless edge triggered | Gate reverses to the opposite direction. | If an obstruction occurred, no action required. If an obstruction did NOT occur, check inputs and wiring. | NO | ## Page 16 # DIAGNOSTIC CODES Some codes are saved in the code history and some are not. If a code is not saved it will briefly appear on the display as it occurs, then disappear. When servicing of the operator is complete, erase the code history by pressing the STOP button until the display flashes “Er” then “CL” (about 6 seconds). When the codes have been erased the display will show “— —”. | Code | Meaning | Symptom | Solution | Saved | |---|---|---|---|---| | EXTERNAL ENTRAPMENT PROTECTION — 70 | CLOSE EYE/INTERRUPT triggered on the main board | During the close cycle the gate will stop and reverse to the full open position and the Timer-to-Close becomes disengaged. The gate will not close. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check the inputs and wiring on the main control board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 71 | CLOSE EDGE triggered on the main board | During the close cycle the gate will stop and reverse to the full open position and the Timer-to-Close becomes disengaged. The gate will not close. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check the inputs and wiring on the main control board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 72 | OPEN EYE/EDGE triggered on the main board | During the open cycle the gate will reverse for 4 seconds, then stop. The gate will not open. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check the inputs and wiring on the main control board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 73 | CLOSE EYE/INTERRUPT triggered on the expansion board | During the close cycle the gate will stop and reverse to the full open position and the Timer-to-Close becomes disengaged. The gate will not close. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check inputs and wiring on the expansion board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 74 | CLOSE EYE/EDGE triggered on the expansion board | During the close cycle the gate will stop and reverse to the full open position and the Timer-to-Close becomes disengaged. The gate will not close. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check inputs and wiring on the expansion board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 75 | OPEN EYE/EDGE triggered on the expansion board | During the open cycle the gate will reverse for 4 seconds, then stop. The gate will not open. | Check for an obstruction in the path of the gate. If an obstruction did NOT occur, check inputs and wiring on the expansion board. | NO | | EXTERNAL ENTRAPMENT PROTECTION — 80 | Close input (EYE/EDGE) communication error between primary and secondary operators | The gate will not move except with constant pressure. | Check inputs and communication method between operators, either wired or wireless. Ensure both operators have power. Erase the wireless communication and reprogram the two operators. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 81 | Open input (EYE/EDGE) communication error between primary and secondary operators | The gate will not move except with constant pressure. | Check inputs and communication method between operators, either wired or wireless. Ensure both operators have power. Erase the wireless communication and reprogram the two operators. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 82 | Close input (EYE/EDGE) communication error between main control board and expansion board | The expansion board LEDs are off and the gate will not move. | Check the connections between the main board and the expansion board. | YES | | EXTERNAL ENTRAPMENT PROTECTION — 83 | Open input (EYE/EDGE) communication error between main control board and expansion board | The expansion board LEDs are off and the gate will not move. | Check the connections between the main board and the expansion board. | YES | ## Page 17 # SOLAR ## SOLAR TROUBLESHOOTING **SYMPTOM** The operator alarm will beep three times with a command and the BATT LOW LED will be on when the solar panel is not charging the battery. **SOLUTIONS** - Check that the correct number of solar panels are connected to the operator. 12V operators require one 10W 12V panel up to a maximum of three 10W 12V panels three solar panels wired in parallel. 24V operators can have up to three arrays of two series wired batteries, with the arrays wired in parallel. See the next page for illustration. - Check that the correct batteries are used for the application. - Check that the whole panel(s) is facing south within 150 feet of the operator and receiving full sunlight. Make sure the solar panels are not in the shade. - Check that the accessories are not drawing current in excess of the maximum 500 mA. Use LiftMaster low current draw accessories. See the solar table in the manual for the recommended current draw. - Verify the number of gate cycles does not exceed the cycle rating based on the Solar Zone of the installation location. - Check that the number of gates cycles corresponds with the solar zones (see below). Refer to your gate operator manual for specific gate cycles. - Ensure that LMRRUL/LMTBUL heater wires are NOT connected. - The system is not compatible with seven-day timers and party mode. - Do not leave the system in bypass for extended times. > Figure: Illustration of a gate and solar panel orientation. A sun shines toward the gate area. Curved arrows point toward a label, “SOUTH.” A crossed-out inset shows a tree shading a solar panel/gate area. Text: “Panels must be shade-free for all daylight hours.” If using two or more panels, make sure they are mounted side by side and are both facing south. ## SOLAR ZONES 1. **ZONE 1 (6 Hours of Sunlight/Day):** Ideal for solar application 2. **ZONE 2 (4 Hours of Sunlight/Day):** Recommended for solar application 3. **ZONE 3 (2 Hours of Sunlight/Day):** Success of solar application will depend on type of gate operator and location of the solar panel **NOT AVAILABLE** > Figure: Color map of North America indicating solar zones. Orange represents Zone 1; yellow represents Zone 2; green represents Zone 3; blue represents NOT AVAILABLE. Canada is blue and labeled “NOT AVAILABLE.” Numbered circular markers “1,” “2,” and “3” appear in corresponding zones. Hawaii inset is orange with a “1” marker. ## Page 18 # SOLAR ## 24V APPLICATIONS Disconnect all power (AC, solar, battery) to the operator before servicing. **NOTE:** 10W 12V solar panels are illustrated in the image below. In normal operation, the voltage across the diode should measure 0.7 VDC. ### 33AH BATTERIES > Figure: 24V wiring diagram for 33AH batteries. A connector labeled **A** connects upward, by arrow, “To ‘BATT DC POWER’ input on control board.” The control-board input graphic is labeled “BATT” and “DC POWER.” Text states: “In normal operation, the voltage across the diode should measure 0.7 VDC.” A component is labeled “Diode.” Two 33AH batteries are shown “(in series),” with positive and negative terminals and connection wires labeled **B**, **C**, and **D**. Three pairs of 10W solar-panel illustrations are connected in series within each pair and in parallel between pairs; red positive and black negative wiring are shown with dashed extensions. Array capacity arrows are labeled “20W,” “40W,” and “60W.” ### 7AH BATTERIES > Figure: 24V wiring diagram for 7AH batteries. A connector labeled **A** connects upward, by arrow, “To ‘BATT DC POWER’ input on control board.” The control-board input graphic is labeled “BATT” and “DC POWER.” A component is labeled “Diode.” Two 7AH batteries are shown “(in series)” with an “Existing Jumper” between battery terminals. Three pairs of 10W solar-panel illustrations are connected in series within each pair and in parallel between pairs; red positive and black negative wiring are shown with dashed extensions. Array capacity arrows are labeled “20W,” “40W,” and “60W.” > Figure: Box titled “ITEMS NEEDED FOR 24V APPLICATIONS.” > **A** — J15 Plug; labels identify “(battery connections)” and “(solar panel connections).” > **B** — Red wire for 33AH battery connections. > **C** — Black wire for 33AH battery connections. > **D** — White jumper wire for 33AH battery connections. > Text below: “The remaining wires in the kit are not needed for 24V applications.” ## Page 19 # SOLAR ## 12V APPLICATIONS Disconnect all power (AC, solar, battery) to the operator before servicing. **NOTE:** 10W 12V solar panels are illustrated in the image below. ### ONE 7AH BATTERY > Figure: 12V wiring diagram for one 7AH battery. A connector labeled **A** connects upward, by arrow, “To ‘BATT DC POWER’ input on control board.” The control-board input graphic is labeled “BATT” and “DC POWER.” Text: “In normal operation, the voltage across the diode should measure 0.7 VDC.” A component is labeled “Diode.” One 7AH Battery is connected to solar panels. Text: “Solar panels are wired in parallel.” Up to three 10W solar panels are shown with dashed parallel wiring. Capacity arrows are labeled “10W,” “20W,” and “30W.” ### TWO 7AH BATTERIES > Figure: 12V wiring diagram for two 7AH batteries. A connector labeled **A** connects upward, by arrow, “To ‘BATT DC POWER’ input on control board.” The control-board input graphic is labeled “BATT” and “DC POWER.” A component is labeled “Diode.” Two 7AH Batteries are shown “(in parallel).” Connection points are labeled **E** and **F**, and a component is labeled “Fuse.” Text: “Solar panels are wired in parallel.” Up to three 10W solar panels are shown with dashed parallel wiring. Capacity arrows are labeled “10W,” “20W,” and “30W.” ### ONE 33AH BATTERY > Figure: 12V wiring diagram for one 33AH battery. A connector labeled **A** connects upward, by arrow, “To ‘BATT DC POWER’ input on control board.” The control-board input graphic is labeled “BATT” and “DC POWER.” A component is labeled “Diode.” Connection wires to the 33AH Battery are labeled **B** and **C**. Text: “Solar panels are wired in parallel.” Up to three 10W solar panels are shown with dashed parallel wiring. Capacity arrows are labeled “10W,” “20W,” and “30W.” > Figure: Box titled “ITEMS NEEDED FOR 12V APPLICATIONS.” > **A** — J15 Plug; labels identify “(battery connections)” and “(solar panel connections).” > **B** — Red wire for 33AH battery connections. > **C** — Black wire for 33AH battery connections. > **E** — Red jumper wire for two 7AH battery connections; “(fuse)” label points to inline fuse. > **F** — Black jumper wire for two 7AH battery connections. > Text below: “The remaining wires in the kit are not needed for 12V applications.” ## Page 20 [illegible] ## Page 21 # POWER ## MODELS CSW200UL AND SL3000UL Follow the steps in order, from the buttom up. > Figure: Control board illustration labeled “CONTROL BOARD,” with LiftMaster logo. Readable board labels include: LEARN, DIAGNOSTICS, BIPART DELAY, TIMER TO CLOSE, REVERSAL FORCE, TEST BUTTONS, OPEN LEFT, OPEN RIGHT, HANDING, OPEN, CLOSE, STOP, ANTENNA, CURRENT SENSOR, MOTOR DRIVE, ID RESET, RPM & LIMITS, ALARM BOARD, EXP. BOARD, and 24 VAC IN. Status labels include INPUT POWER, GATE MOVING, TIMER, and DC PWR OVLD. > Figure: Operator location illustrations. MODEL CSW200UL illustration identifies POWER BOARD (located behind control board), CONTROL BOARD, AC POWER SWITCH, and JUNCTION BOX. MODEL SL3000UL illustration identifies POWER BOARD (located behind control board), CONTROL BOARD, AC POWER SWITCH, and JUNCTION BOX. > Figure: Power troubleshooting wiring diagram. A “POWER BOARD — SINGLE PHASE” is connected to a transformer with orange wires to “24 VAC IN” at the control board. Transformer terminals are labeled COM, 120, and 240; wiring labels include Yellow and Gray. The power board is connected to a junction box with Green, Black, and White wires; incoming power conductors are labeled GROUND, HOT, and NEUTRAL. An AC outlet/switch box is labeled AC POWER SWITCH. A multimeter icon is marked with an asterisk. 1. **Check the incoming power.*** Check breaker first, then check wiring coming into operator. The voltage should be 120 Vac. 2. **Check the AC power switch.** Is it ON? 3. **Check the power board.*** Check the gray and yellow transformer wires on the power board. The voltage should be 120 Vac. If not, replace the power board. 4. **Check the transformer and control board.*** Check the orange 24 VAC IN wires at the control board. The voltage should be about 21-28 Vac. If the voltage is NOT 21-28 Vac, replace the transformer. If the voltage is 21-28 Vac, replace the control board. ## Page 22 # POWER ## MODELS SL585UL AND SL595UL (SINGLE PHASE) Follow the steps in order, from the buttom up. > Figure: Control board illustration labeled “CONTROL BOARD,” with LiftMaster logo. Readable board labels include: LEARN, DIAGNOSTICS, BIPART DELAY, TIMER TO CLOSE, REVERSAL FORCE, TEST BUTTONS, OPEN LEFT, OPEN RIGHT, HANDING, OPEN, CLOSE, STOP, ANTENNA, CURRENT SENSOR, MOTOR DRIVE, ID RESET, RPM & LIMITS, ALARM BOARD, EXP. BOARD, and 24 VAC IN. > Figure: Operator location illustrations. MODEL SL585UL identifies CONTROL BOARD, POWER BOARD, AC POWER SWITCH, and JUNCTION BOX. MODEL SL595UL identifies CONTROL BOARD, POWER BOARD, and JUNCTION BOX. > Figure: Single-phase power wiring diagram. The control board 24 VAC IN terminals connect to the transformer using Blue and Yellow wires. Transformer is labeled COM, 120, 208, 240, 480, 24 VAC, and 3.15A FUSE; a fuse is identified by an arrow. Power-board transformer wires are labeled White, Black, Red, and Orange. Power board terminals/labels include SWITCH (ORANGE) COMM, SWITCH (YELLOW) PWR IN, 120V OUTLET, 120V, and 240V. Junction-box conductors are labeled NEUTRAL, HOT, GROUND, White, Black, and Green. An outlet/switch box is labeled AC POWER SWITCH. A multimeter icon is marked with an asterisk. Arrow note: “To configure the motor for 208V, swap the orange and red wires and plug motor into the 240V position.” 1. **Check the incoming power.*** Check breaker first, then check wiring coming into operator. The voltage should be 120, 208, or 240 Vac depending on the application. 2. **Check the AC power switch.** Is it ON? 3. **Check the power board.*** Check the following transformer wires on the power board: *120V Applications:* Check the white and black wires, voltage should be 120 Vac *208V Applications:* Check the white and red wires, voltage should be 208 Vac *240V Applications:* Check the white and orange wires, voltage should be 240 Vac If the voltage is not correct, replace the power board. 4. **Check the transformer and control board.*** Check the blue and yellow 24 VAC IN wires at the control board. The voltage should be about 21-28 Vac. If the voltage is NOT 21-28 Vac, replace the transformer. If the voltage is 21-28 Vac, replace the fuse. If the fuse is good, replace the control board. ## Page 23 # POWER ## MODELS SL585UL AND SL595UL (THREE PHASE) Follow the steps in order, from the buttom up. > Figure: Control board illustration labeled “CONTROL BOARD,” with LiftMaster logo. Readable board labels include: LEARN, DIAGNOSTICS, BIPART DELAY, TIMER TO CLOSE, REVERSAL FORCE, TEST BUTTONS, OPEN LEFT, OPEN RIGHT, HANDING, OPEN, CLOSE, STOP, ANTENNA, CURRENT SENSOR, MOTOR DRIVE, ID RESET, RPM & LIMITS, ALARM BOARD, EXP. BOARD, and 24 VAC IN. > Figure: Operator location illustrations. MODEL SL585UL identifies CONTROL BOARD, POWER BOARD, AC POWER SWITCH, and JUNCTION BOX. MODEL SL595UL identifies CONTROL BOARD, POWER BOARD, and JUNCTION BOX. > Figure: Three-phase power wiring diagram. The control board 24 VAC IN terminals connect to the transformer using Blue and Yellow wires. Transformer terminals are labeled COM, 120, 208, 240, 460, 24 VAC, and 3.15A FUSE; a fuse is identified by an arrow. Transformer wires to the power board are labeled White, Red, Orange, and Purple. Power board is labeled “POWER BOARD — THREE PHASE” and includes labels 120V, 24V, BRAKE, 480V, and 240V/208V 575V. Junction-box wiring is labeled L3 Purple, L2 White, L1 Black, and Green; incoming conductors are labeled INCOMING POWER. An AC outlet/switch box is labeled AC POWER SWITCH. A multimeter icon is marked with an asterisk. Arrow note: “To configure the motor for 208V, swap the orange and red wires and plug motor into the 208V / 240V position.” 1. **Check the incoming power.*** Check breaker first, then check wiring coming into operator. The voltage should be 208, 240, or 480 Vac depending on the application. 2. **Check the AC power switch.** Is it ON? 3. **Check the power board.*** Check the following transformer wires on the power board: *208V Applications:* Check the white and red wires, voltage should be 208 Vac *240V Applications:* Check the white and orange wires, voltage should be 240 Vac *480V Applications:* Check the white and purple wires, voltage should be 480 Vac If the voltage is not correct, replace the power board. 4. **Check the transformer and control board.*** Check the blue and yellow 24 VAC IN wires at the control board. The voltage should be about 21-28 Vac. If the voltage is NOT 21-28 Vac, replace the transformer. If the voltage is 21-28 Vac, replace the fuse. If the fuse is good, replace the control board. ## Page 24 # POWER ## MODEL LA412UL **SYMPTOM:** Operator does not have power. > Figure: Open control-box illustration with callouts identifying CONTROL BOX and CONTROL BOARD. A multimeter icon is marked with an asterisk. > Figure: Solar-power wiring diagram. Control board terminal area is labeled CONTROL BOARD and J15, with terminals labeled BATT and DC POWER. A J15 Plug connects battery and solar-panel wiring. Two batteries are labeled “Battery 12V 7AH,” wired in parallel; a 20A FUSE is shown. Wire labels include Red and Black. A diode is labeled “0.7 VDC.” Three solar panels are shown, each labeled “10W 12V”; heading reads “Solar Panels — 10W minimum - 30W maximum, wired in parallel.” Dashed red and black wiring indicates parallel connections. Callout text states: “Voltage across this diode should be approximately 0.7VDC while the harness is connected to J15. If it is higher than a volt, or is zero volts, replace the solar harn[illegible].” Bottom note states: “In normal operation, the diode should measure 0.7 VDC. If it measures 0.0 VDC or higher than 1 VDC, replace the [illegible].” 1. **Check the solar panels.*** Check the voltage coming from the solar panels with the harness connected to the board. Make sure that the panels are in full sun. The voltage should be between 12VDC and 20VDC, and it must not be lower that the battery voltage. 2. **Check the batteries.*** Check the battery connections. Make sure there is one or two 7AH batteries wired in parallel, OR one 33AH battery connected. With the batteries disconnected, each battery should read 12.8 to 13.3 VDC. With the batteries connected to the system, the battery voltage should not drop below 11.5VDC when running. 3. **Check the control board.*** Try replacing the fuse. If that does not work, replace the control board. ## Page 25 # POWER ## MODEL LA400UL **SYMPTOM: Operator does not have power.** > Figure: Open control box illustration. Labels: **OUTLET HOUSING**, **CONTROL BOX**, **CONTROL BOARD**, **Incoming Power**. A multimeter illustration marked with an asterisk (*) appears at right. > Figure: Incoming-power wiring diagram labeled **(Back of Outlet Housing)**. Two components are labeled **Outlet**. Wire labels: **Black**, **Green**, **White**. Input terminals are labeled **HOT**, **GROUND**, **NEUTRAL**. Red text: **Incoming Power**. **1 Check the incoming power.\*** Check breaker first, then check wiring coming into operator. The reading should be 120 Vac. > Figure: Control-board and battery/transformer wiring diagram. Labels include **CONTROL BOARD**, **J15 Plug**, **Battery 12V 7AH** (two batteries), **CHARGER**, and wire labels **Red** and **Black**. The board connector is labeled **J15**, with **+ BATT -** and **DC POWER**. **2 Check the transformer.\*** Check the voltage coming from the transformer (red and black wires at the CHARGER terminals). The reading should be 34 Vdc (+/- 10%). If not, replace the transformer. **3 Check the batteries.\*** Check the battery connections. Make sure there is one or two 7AM batteries wired in parallel, OR one 33AH battery connected. With the batteries disconnected, each battery should read 12.8 to 13.3 VDC. With the batteries connected to the system, the battery voltage should not drop below 11.5VDC when running. If not, replace the batteries. **4 Check the control board.\*** Try replacing the fuse. If that does not work, replace the control board. ## Page 26 # POWER ## MODEL LA500UL **SYMPTOM: Operator does not have power.** > Figure: Open control box illustration. Labels: **TRANSFORMER**, **BRIDGE RECTIFIER**, **AC POWER SWITCH**, **CONTROL BOX**, **CONTROL BOARD**, and **Incoming Power**. **1 Check the incoming power.\*** Check breaker first, then check wiring coming into operator. The voltage should be 120 Vac or 240 Vac depending on the application. **2 Check the AC power switch.** Is it ON? > Figure: AC input and transformer/bridge-rectifier wiring diagram. Labels: **Transformer**, **Bridge Rectifier**, **EMI BOARD**, **Power Wiring Sockets (120 Vac factory default)**, **Incoming Power**. Wire labels include **Blue**, **Brown**, **Gray**, **Purple**, **Black**, **Red**, **Green**, and **White**. Input terminals: **HOT**, **GROUND**, **NEUTRAL**. Power-socket markings: **120** and **240**. **3 Check the power wiring connector.** Is it plugged into the correct socket? **4 Check the transformer.\*** Check the transformer voltage going into the bridge rectifier (orange and yellow wires). The reading should be 24 Vac (+/- 10%). If not, replace the transformer. **5 Check the bridge rectifier.\*** Check the voltage coming out of the bridge rectifier (red and black wires). The reading should be around 38VDC with J15 connected. If not, replace the bridge rectifier. > Figure: Control-board, J15 plug, battery, and charger wiring diagram. Labels: **CONTROL BOARD**, **J15 Plug**, **Battery 12V 7AH** (two batteries), **CHARGER**. Wire labels: **Red**, **Black**. J15 markings: **+ BATT -** and **DC POWER**. A multimeter illustration marked with an asterisk (*) appears at right. **6 Check the batteries.\*** Check the battery connections. Make sure there is one or two 7AM batteries wired in parallel, OR one 33AH battery connected. With the batteries disconnected, each battery should read 12.8 to 13.3 VDC. With the batteries connected to the system, the battery voltage should not drop below 11.5VDC when running. If not, replace the batteries. **7 Check the control board.** Try replacing the fuse on the control board. If that does not work, replace the control board. ## Page 27 # POWER ## MODELS CSL24UL AND CSW24UL **SYMPTOM: Operator does not have power.** > Figure: Model illustrations labeled **MODEL CSW24U** and **MODEL CSL24U**. Each identifies **CONTROL BOARD**, **OUTLET HOUSING**, and **BATTERIES**. Text below each illustration: **TRANSFORMER and BRIDGE RECTIFIER located on chassis, behind the electrical box.** **1 Check the incoming power.\*** Check breaker first, then check wiring coming into operator. The voltage should be 120 Vac or 240 Vac depending on the application. **2 Check the AC power switch.** Is it ON? > Figure: Outlet-housing and power-wiring diagram. Labels: **OUTLET HOUSING**, **(Back of Outlet Housing)**, **EMI BOARD**, **Power Wiring Sockets (120 Vac factory default)**, **Power Wiring Connector**, and **Input Power Connection**. Wire labels: **Black**, **Green**, **White**, **Gray**, **Blue**, **Brown**, **Purple**. Input terminals: **HOT**, **GROUND**, **NEUTRAL**. Power-socket markings: **120** and **240**. **3 Check the power wiring connector.** Is it plugged into the correct socket? **4 Check the transformer.\*** Check the transformer voltage going into the bridge rectifier (orange wires). The reading should be 24 Vac (+/- 15%). If not, replace the transformer. > Figure: Transformer and bridge-rectifier wiring illustration. Labels: **TRANSFORMER**, **BRIDGE RECTIFIER**, and wire color **Orange**. **5 Check the bridge rectifier.\*** Check the voltage coming out of the bridge rectifier (red and black wires). The reading should be approximately 35VDC with the J15 plug connected to the main board. If not, replace the bridge rectifier. > Figure: Control-board, J15 plug, and battery wiring diagram. Labels: **CONTROL BOARD**, **Fuse**, **J15 Plug**, **Battery 12V 7AH** (two batteries). Wire labels: **Red** and **Black**. A multimeter illustration marked with an asterisk (*) appears at right. **6 Check the batteries.\*** Check the battery connections. Make sure there is one or two 7AM batteries wired in parallel, OR one 33AH battery connected. With the batteries disconnected, each battery should read 12.8 to 13.3 VDC. With the batteries connected to the system, the battery voltage should not drop below 11.5VDC when running. If not, replace the batteries. **7 Check the control board.** Try replacing the fuse on the control board. If that does not work, replace the control board. ## Page 28 # POWER ## MODELS RSL12UL AND RSW12UL **SYMPTOM: Operator does not have power.** > Figure: Operator cabinet illustrations showing removed covers and internal wiring. A separate component is labeled **Transformer**. A multimeter illustration marked with an asterisk (*) appears at right. > Figure: Incoming-power outlet-housing wiring diagram. Labels: **(Back of Outlet Housing)**, **Outlet** (two locations), **OUTLET HOUSING**, and **Incoming Power**. Wire labels: **Black**, **Green**, **White**. Input terminals: **HOT**, **GROUND**, **NEUTRAL**. **1 Check the incoming power.\*** Check breaker first, then check voltage coming into operator. The voltage should be 120 Vac. > Figure: Control-board and battery diagram. Labels: **CONTROL BOARD**, **Fus** [illegible], **J15 Plug**, and **Battery 12V 7AH**. Wire labels: **Red** and **Black**. **2 Check the batteries.\*** Check the battery connections. Make sure there is one or two 7AM batteries wired in parallel, OR one 33AH battery connected. With the batteries disconnected, each battery should read 12.8 to 13.3 VDC. With the batteries connected to the system, the battery voltage should not drop below 11.5VDC when running. If not, replace the batteries. **3 Check the control board.\*** Try replacing the fuse on the control board. If that does not work, replace the control board. ## Page 29 MyQ® # FREQUENTLY ASKED QUESTIONS **What do I need to activate the gate operator using MyQ®?** a. Router b. Internet connection c. Internet Gateway d. Internet Gateway serial number (located on the bottom of the Internet Gateway) e. MyQ-Enabled Gate Operator **What is an Internet Gateway?** The Internet Gateway (828LM), is a 900 MHz Internet Protocol device for monitoring and controlling MyQ devices (e.g. gate operator or light control). **Does an Internet Protocol Address or Dynamic Host Configuration Protocol need to be established for the Internet Gateway?** Yes, the Internet Gateway (828LM) requires a Dynamic Host Configuration Protocol (DHCP). **What is the required speed of the Ethernet port for the Internet Gateway?** The Internet Gateway has a minimum speed of 10 Mb/s. **How does the Internet Gateway connect to an existing residential or commercial network?** The Internet Gateway needs to be connected to a Local Area Network port on a network router or network switch, establishing connection to the Internet. When the Internet Gateway connects to the Internet, a secure session is established with the MyQ server. **Can the Internet Gateway be pinged to verify connection to a network?** The Internet Gateway does not support a ping response. **Can a static IP address be established on the Internet Gateway?** A static IP address cannot be established on this device. The Internet Gateway requires the router/Dynamic Host Configuration Protocol (DHCP) to provide a Local Area Network (LAN) Internet Protocol (IP) address. **How can the Internet Gateway be tested from the Internet?** To test the Internet Gateway from the Internet, do either of the following: a. Add the Internet Gateway to a MyQ account. If the Internet Gateway is already on a MyQ account, add a MyQ-Enabled device (e.g. gate operator or light control) to the MyQ account. b. If a MyQ-Enabled device is already on the MyQ account, provide a command (open/close, on/off) using the MyQ app. # FREQUENTLY ASKED QUESTIONS **Can the Internet Gateway be connected from a remote location using the Wide Area Network (WAN) to our corporate offices and access the Internet from the corporate location?** ## Page 30 MyQ® If the Internet Gateway is successfully connected to the MyQ® server (green LED on MyQ Gateway is illuminated and solid), the MyQ app can monitor and control a MyQ device from any location. All MyQ-Enabled devices must be on the MyQ account and be within transmitting capability of the Internet Gateway. **Are communications to/from the Internet Gateway encrypted?** The Internet Gateway uses AES-128 encryption for all communications through the Internet. The Internet Gateway uses proprietary data encryption over 900 MHz to/from MyQ devices. **How can the MAC address of the Internet Gateway be obtained?** To obtain the MAC address, connect the Internet Gateway to a network router and use a computer to login into the router and locate the MAC address within the connected devices list. A MAC address for an Internet Gateway should be in the following format: 64:52:99: XX: XX: XX. **How to put a MyQ Gate Operator into programming/learn mode:** Press the learn button twice on the primary operator (the operator will beep as it enters learn mode). The Internet Gateway will pair to the gate operator if it is within range, and the gate operator will beep again if programming is successful. **How to use the RESET button to put a MyQ Gate Operator into programming / learn mode when the gate is closed:** 1. Ensure the gate is closed. 2. Give the gate operator an OPEN command. 3. Within 30 seconds, when the gate is at the open limit, press and release the RESET button 3 times (on the primary gate) to put the primary operator into high band learn mode (the gate operator will beep as it enters learn mode). 4. The Internet Gateway will pair to the gate operator if it is within range and the gate operator will beep again if programming is successful. 5. The status as shown by the Internet Gateway app will be either “open” or “closed”. The gate operator can then be controlled through the Internet Gateway app. ## Page 31 MyQ® # TROUBLESHOOTING MyQ® If issues are experienced when adding an Internet Gateway, a LiftMaster Gate Operator or light control to a MyQ® account, please review the troubleshooting topics below. # CONNECTION ISSUES **PROBLEM** If the green LED on the Internet Gateway is not illuminated or blinking, the Internet Gateway is not connected to the Internet. **SOLUTION** There are a few different reasons an Internet Gateway will not successfully connect to the Internet: - An incompatible router - A router configuration setting (e.g. MAC address filtering) - A network security appliance (firewall) **PROBLEM** Green LED on the Internet Gateway is off. The router or network switch is not providing an IP address to the Internet Gateway. **SOLUTION** - Verify power to the Internet Gateway. Disconnect and reconnect power to the Internet Gateway. The blue and green LEDs should blink on and off a few times when the Internet Gateway is initially powered. - Check the Ethernet cable connections between the Internet Gateway, router, or network switch. - Confirm the router or network switch is providing a connection to the Internet. - Check if the router or switch is incompatible with the Internet Gateway. Go to LiftMaster.com/MyQ-PAS and look for the Incompatible Router and Switch section. - Connect the Internet Gateway to a different LAN port on the router or network switch. Determine if a router setting is preventing the Internet Gateway from obtaining an IP address (e.g. MAC address filtering, firewall settings). - Review the router’s settings and manual. - Router must be set to DHCP to provide an IP address to the Internet Gateway. - The Internet Gateway requires TCP Port 8883. Verify that it is open on external or internal firewalls. Reset the router. Disconnect power to the router for 30 seconds. Reconnect power to the router. Wait up to 5 minutes after the router is active to determine if the green LED on the Internet Gateway is illuminated solid or blinking. **PROBLEM** Green LED on the Internet Gateway is blinking. If the green LED on the Internet Gateway is blinking, the Internet Gateway has obtained an IP address from the router, but the Internet Gateway is not connecting to the MyQ® server. **SOLUTION** Determine if a router setting (e.g. firewall setting) is preventing the Internet Gateway from communicating with the Internet. - Review the router’s settings and manual. - The Internet Gateway requires UDP port 80 to have a UDP timeout of 180 seconds or greater. Determine if a network security appliance (firewall, e.g. SonicWALL®, ZyWall) is installed. - Determine if the network security settings are preventing connection of the Internet Gateway to the Internet. - The Internet Gateway requires UDP port 80 to have a UDP timeout of 180 seconds or greater. SonicWALL’s UDP timeout must be adjusted to be 180 seconds or longer for both inbound and outbound data traffic. See SonicWALL Fire Wall section for more information. ## Page 32 MyQ® # MyQ® ACCOUNT ISSUES **Unable to add more than one MyQ device to a MyQ account:** - Prior to adding MyQ devices, an account must be established. An account can be created by downloading the MyQ app from a smartphone or tablet app store. - Up to sixteen MyQ devices may be added to one Internet Gateway (828LM). If more than sixteen MyQ devices are required, additional Internet Gateways can be installed and added to the same MyQ account. For optimal performance of MyQ, the maximum number of devices added per account should not exceed 32. - MyQ provides the ability to monitor and control MyQ-Enabled Gate Operators at more than one location from the same account. To monitor and control MyQ-Enabled Gate Operators at more than one location, additional Internet Gateways will be required at each location. - An illuminated blue LED will be solid on an Internet Gateway when one or more MyQ devices (gate operator or light control) are paired to an Internet Gateway. The blue LED will not illuminate if no MyQ devices are paired to the Internet Gateway. **NOTE:** A MyQ device can only be associated (added) to one MyQ account. **If a MyQ device fails to add to a MyQ account, please review the troubleshooting steps below:** If a pop-up error message appears on the MyQ app when attempting to add a device, verify the MyQ device is not already associated with another MyQ account. If the “add device” process times out after three minutes, the MyQ device may not be in the programming/learn mode or may be out of range of the Internet Gateway. Sample error message that may be encountered: No response, gate operator is not responding. Please try again later. **PROBLEM** Unable to add a MyQ-Enabled Gate Operator to a MyQ account. **SOLUTION** - Confirm the Internet Gateway is powered and the green LED illuminated and solid. - Confirm the Internet Gateway is added to the MyQ account. - Confirm the MyQ-Enabled Gate Operator is in the programming/learn mode. - Confirm the signal from the Internet Gateway can reach the MyQ-Enabled Gate Operator. Depending upon obstructions, the average range from the Internet Gateway is between 300 to 600 feet. Are there too many walls between the Internet Gateway and the gate operator? To test a MyQ-Enabled Gate Operator, program a remote control to the operator and stand near the Internet Gateway. Test if a remote control can operate the MyQ-Enabled Gate Operator. If necessary, relocate the Internet Gateway closer to the MyQ-Enabled Gate Operator using a longer CAT5 cable or higher quality Ethernet cable (up to 100 feet). - Confirm the antenna is installed on the gate operator. The antenna is included inside a poly bag on the gate operator cover along with the installation manual, user guide and quick start guide. - MyQ-Enabled devices communicate using a 900 MHz radio signal. Electronic devices in the same area of the Internet Gateway or MyQ devices may create a range issue. Some troubleshooting options include powering down or relocating other 900 MHz products (900 MHz cordless phone, etc.) in the area of the MyQ device causing the interference. ## Page 33 MyQ® # MyQ® ACCOUNT ISSUES **PROBLEM** The MyQ-Enabled Gate Operator will not respond to the app. **SOLUTION** - Confirm the green LED on the Internet Gateway is illuminated and solid. If the green LED is not illuminated or blinking, see Connection Issues section. - For a MyQ-Enabled Gate Operator, confirm that the operator is powered up and fully operational. Control the MyQ-Enabled Gate Operator from a remote control. - Confirm the MyQ-Enabled Gate Operator has been added to the MyQ account (a gate operator image should be present on the Places screen of the app). - Confirm the signal from the Internet Gateway can reach the MyQ-Enabled Gate Operator. Depending upon obstructions, the average range from the Internet Gateway is between 300 to 600 feet. Are there too many walls between the Internet Gateway and the gate operator? To test a MyQ-Enabled Gate Operator, program a remote control to the operator and stand near the Internet Gateway. Test if a remote control can operate the MyQ-Enabled Gate Operator. If necessary, relocate the Internet Gateway closer to the MyQ-Enabled Gate Operator using a longer CAT5 cable or higher quality Ethernet cable (up to 100 feet). - MyQ devices communicate using a 900 MHz radio signal. Electronic devices in the same area of the Internet Gateway or MyQ-Enabled Gate Operator may create a range issue. Some troubleshooting options include powering down or relocating other 900 MHz products (900 MHz cordless phone, etc.) in the area of the MyQ-Enabled Gate Operator causing the interference. 32 ## Page 34 MyQ® # MyQ® ERROR CODES Below are potential error codes that may be encountered when working with the Internet Gateway, MyQ® app, MyQ website, or your PC or smartphone. ## GENERAL ERROR CODES | ERROR CODE | MESSAGE | ISSUE AND RESOLUTION | |---|---|---| | 209 | Unable to remove device. | • Server was not able to confirm the deletion or removal of a device.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 223 | Gateway is offline. | • Check the power outlet and identify if the blue and green LED’s on Internet Gateway are illuminated.<br><br>• If the Internet Gateway appears to have no Internet connection, verify a computer in the facility attached to the network has an Internet connection by loading a web page.<br><br>• Log out of account. Restart the Internet Gateway by powering off and then back on. The Internet Gateway will need to be unplugged to power off. Log back into the account.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 224 | Gateway is in learn mode. | • The app or website may not have connected to the myQ server, please try again.<br><br>• Log out of the account. Restart the Internet Gateway by powering off and back on. The Internet Gateway will need to be unplugged to power off.<br><br>• Log into the account and attempt to reprogram devices.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 301 | The Gateway or hub serial number was invalid. | • Identify the serial number located on the bottom of the Internet Gateway.<br><br>• Verify the serial number. Ensure a 0 is a number.<br><br>• Try again to register the device with the correct serial number.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 303 | Gateway serial number is not recognized after several attempts. | • Identify the serial number on the bottom of the Internet Gateway.<br><br>• Verify the serial number. Ensure a 0 is a number.<br><br>• Try again to register the device with the correct serial number.<br><br>• Delete the account and create a new account.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 304 | Please make sure the device* is connected and the green LED is solid ON. | • Check the power outlet and identify if the green LED on the Internet Gateway device is illuminated.<br><br>• Log out of the account. If the Internet Gateway appears to not have an Internet connection, verify a computer in the facility attached to the network has an Internet connection by loading a web page. Restart the Internet Gateway by powering off and back on. The Internet Gateway will need to be unplugged to power off.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | \* A myQ-Enabled Gate Operator is considered a device. 33 ## Page 35 MyQ® # MyQ® ERROR CODES Below are potential error codes that may be encountered when working with the Internet Gateway, MyQ® app, MyQ website, or your PC or smartphone. ## GENERAL ERROR CODES | ERROR CODE | MESSAGE | ISSUE AND RESOLUTION | |---|---|---| | 305 | The device* is currently in Learn Mode. | • The application or website may not have connected with the MyQ® server, please try again.<br><br>• Log out of the account. Restart the Internet Gateway by powering off and back on. The Internet Gateway will need to be unplugged to power off. Log back into the account and attempt to reprogram the device.<br><br>• If you continue to experience a problem, contact the LiftMaster Technical Service Center at 800.528.2806. | | 308 | A device* is not responding. | • Ensure the MyQ device* is powered and within range of the Internet Gateway.<br><br>• A MyQ device* is not responding. Verify the device is plugged into an outlet with power.<br><br>• Operate device manually.<br><br>• If the device responds, remove the device from the account. Add the device back to the account. If the device does not respond, the device may need to be replaced or serviced.<br><br>• Contact a local dealer or LiftMaster Technical Service Center at 800.528.2806. | | 309 | The Gateway is offline. | • The Internet Gateway has no power. Check the power outlet and identify if the green and blue LED’s on the Internet Gateway device are illuminated.<br><br>• If the Internet Gateway appears to not have an Internet connection, verify a computer in the facility attached to the network has an Internet connection by loading a web page. Log out of the account. Restart the Internet Gateway by powering off and back on. The Internet Gateway will need to be unplugged to power off. Log back into the account. | | 310 | Device is on another user’s account and unable to register. | • The Internet Gateway or device is already registered to another account.<br><br>• The device must be removed from the account before it can be added to a new account. If you have access to the other account, log into the account and remove the device. If you do not have access to the other account, you will not be able to add it to a new account. | \* A MyQ-Enabled Gate Operator is considered a device. 34 ## Page 36 MyQ® # INCOMPATIBLE ROUTER AND SWITCH ## INCOMPATIBLE ROUTER When installing an Internet Gateway, issues have been identified with the following routers/modems: | MANUFACTURER | MODEL | |---|---| | Belkin® | F5D8236-4 (Only works on LAN ports 1 & 3) | | D-Link® | DIR-665 | | Huawei® Router/Modem | Echolife HG520C | | Linksys®/Cisco® | WRT610N version 1 | | Netgear® | CGD24G Cable Modem | | SMC Networks® | SMC8014WN | | TRENDnet® | 5-Port-10/100mbps Switch TE100-S5 | | Ubee® | DDW3610 | | Verizon® | Actiontec M1424-WRREV (Rev E) Modem Router | | Westell® Modems | A90-7500 DSL Modem | The above routers use non-standard internal port wiring incompatible with the Internet Gateway. A hub or switch may resolve this situation, but is not a verified fix. ## INCOMPATIBLE NETWORK SWITCH When installing an Internet Gateway, an identified issue has been associated with the following network switch: | MANUFACTURER | MODEL | |---|---| | TRENDnet | 5-Port-10/100Mbps TE100-S5 | ## SONICWALL® FIRE WALL **PROBLEM** The performance issues listed below are caused by SonicWALL’s factory default UDP connection timer being set to 30 seconds, which closes the Internet Gateway connection to the server after the Internet Gateway enters its sleep state and reduces its communication to the server to once every 60 seconds. When this occurs, the Internet Gateway will take up to 2 minutes to recognize connection to the server is lost before having to re-establish connection. This process will continue to repeat. When a MyQ® device is behind a SonicWALL Network Appliance, the following MyQ app performance issues may occur: - Difficulty controlling a MyQ device through the MyQ app. - Manual operation by a MyQ device may not change status on the MyQ app (gate operator is closed by pressing the remote control, but app shows gate open). - Upon power cycling of an Internet Gateway, the app will work for a brief period of time and then enter a non-working state. **SOLUTION** The SonicWALL UDP Connection timer should be changed to 120 seconds or greater. LiftMaster® recommends a minimum value of 180 seconds. The timer must be changed in multiple locations. - The default UDP timer should be changed, which will change the UDP connection timer for any new rule made to the SonicWALL. - Any current LAN -> WAN rules must have the UDP connection timeout updated manually. Set “Default UDP Connection Timeout (seconds):” to “360” and set “UDP Connection Inactivity Timeout (seconds):” to “360”. 35 ## Page 37 ## Page 38 ## Page 39 ## Page 40 LiftMaster 300 Windsor Drive Oak Brook, IL 60523 LiftMaster.com 114-5965-000 © 2023 LiftMaster – All Rights Reserved